+Article 23 6.

Article 23 6.

By 5 January 2020, the ENTSO for Electricity shall submit to ACER a draft methodology for calculating:

(a) 

the value of lost load;

(b) 

the cost of new entry for generation, or demand response; and

(c) 

the reliability standard referred to in Article 25.

The methodology shall be based on transparent, objective and verifiable criteria.

1. Overzicht

,
Titel Regelgeving

1.1 Referenties

1.2 Geïdentificeerde eisen

1.3 Gerelateerde standaarden

2. Geïdentificeerde eisen

Eisen
Bron Eis

3. Gerelateerde standaarden

Standaarden
Bron Eis