+Article 23 6.

Article 23 6.

By 5 January 2020, the ENTSO for Electricity shall submit to ACER a draft methodology for calculating:

(a) 

the value of lost load;

(b) 

the cost of new entry for generation, or demand response; and

(c) 

the reliability standard referred to in Article 25.

The methodology shall be based on transparent, objective and verifiable criteria.

1. Översikt

,
Rubrik Reglering

1.1 Referenser

1.2 Identifierade krav

1.3 Relaterade standarder

2. Identifierade krav

Krav
Källa Krav

3. Relaterade standarder

Standarder
Källa Krav