+Article 59 12.
|
Article 59 12.
Where the ENTSO for Electricity or the EU DSO entity have failed to develop a network code within the period set by the Commission under paragraph 9, the Commission may request ACER to prepare a draft network code on the basis of the relevant framework guideline. ACER may launch a further consultation in the course of preparing a draft network code under this paragraph. ACER shall submit a draft network code prepared under this paragraph to the Commission and may recommend that it be adopted.
1. Ülevaade
1.1 Viited
1.2 Tuvastatud nõuded
1.3 Seotud standardid
2. Tuvastatud nõuded
3. Seotud standardid
|