+Article 59 12.

Article 59 12.

Where the ENTSO for Electricity or the EU DSO entity have failed to develop a network code within the period set by the Commission under paragraph 9, the Commission may request ACER to prepare a draft network code on the basis of the relevant framework guideline. ACER may launch a further consultation in the course of preparing a draft network code under this paragraph. ACER shall submit a draft network code prepared under this paragraph to the Commission and may recommend that it be adopted.

1. Översikt

,
Rubrik Reglering

1.1 Referenser

1.2 Identifierade krav

1.3 Relaterade standarder

2. Identifierade krav

Krav
Källa Krav

3. Relaterade standarder

Standarder
Källa Krav