+Article 59 12.
|
Article 59 12.
Where the ENTSO for Electricity or the EU DSO entity have failed to develop a network code within the period set by the Commission under paragraph 9, the Commission may request ACER to prepare a draft network code on the basis of the relevant framework guideline. ACER may launch a further consultation in the course of preparing a draft network code under this paragraph. ACER shall submit a draft network code prepared under this paragraph to the Commission and may recommend that it be adopted.
1. Vue d’ensemble
| Intitulé |
Réglementation |
,
1.1 Références
1.2 Exigences identifiées
1.3 Normes associées
2. Exigences identifiées
Exigences
| Source |
Exigence |
3. Normes associées
|