+Article 59 12.

Article 59 12.

Where the ENTSO for Electricity or the EU DSO entity have failed to develop a network code within the period set by the Commission under paragraph 9, the Commission may request ACER to prepare a draft network code on the basis of the relevant framework guideline. ACER may launch a further consultation in the course of preparing a draft network code under this paragraph. ACER shall submit a draft network code prepared under this paragraph to the Commission and may recommend that it be adopted.

1. Forbhreathnú

,
Teideal Rialáil

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Caighdeáin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Caighdeáin ghaolmhara

Caighdeáin
Foinse Ceanglas