+Article 6 1

Article 6 1

1.   From 1 January 2030, a ship moored at the quayside in a port of call which is covered by Article 9 of Regulation (EU) 2023/1804 and which is under the jurisdiction of a Member State shall connect to OPS and use it for all its electrical power demand at berth.

1. Yleiskatsaus

,
Otsikko Sääntely

1.1 Viittaukset

1.2 Tunnistetut vaatimukset

1.3 Liittyvät standardit

2. Tunnistetut vaatimukset

Vaatimukset
Lähde Vaatimus

3. Liittyvät standardit

Standardit
Lähde Vaatimus