|
+Article 6 1 |
Article 6 11. From 1 January 2030, a ship moored at the quayside in a port of call which is covered by Article 9 of Regulation (EU) 2023/1804 and which is under the jurisdiction of a Member State shall connect to OPS and use it for all its electrical power demand at berth. 1. Forbhreathnú
1.1 Tagairtí1.2 Ceanglais aitheanta1.3 Caighdeáin ghaolmhara2. Ceanglais aitheanta
3. Caighdeáin ghaolmhara
|