+Article 6 1

Article 6 1

1.   From 1 January 2030, a ship moored at the quayside in a port of call which is covered by Article 9 of Regulation (EU) 2023/1804 and which is under the jurisdiction of a Member State shall connect to OPS and use it for all its electrical power demand at berth.

1. Översikt

,
Rubrik Reglering

1.1 Referenser

1.2 Identifierade krav

1.3 Relaterade standarder

2. Identifierade krav

Krav
Källa Krav

3. Relaterade standarder

Standarder
Källa Krav