+Article 6 1

Article 6 1

1.   From 1 January 2030, a ship moored at the quayside in a port of call which is covered by Article 9 of Regulation (EU) 2023/1804 and which is under the jurisdiction of a Member State shall connect to OPS and use it for all its electrical power demand at berth.

1. Vue d’ensemble

,
Intitulé Réglementation

1.1 Références

1.2 Exigences identifiées

1.3 Normes associées

2. Exigences identifiées

Exigences
Source Exigence

3. Normes associées

Normes
Source Exigence