+Airteagal 18 Maoluithe ó oibleagáid an díothaithe mhear
---+Article 18 1.
---+Article 18 2.
---+Article 18 3.
---+Article 18 4.
---+Article 18 5.
---+Article 18 6.

Airteagal 18 Maoluithe ó oibleagáid an díothaithe mhear

Airteagal 18

Maoluithe ó oibleagáid an díothaithe mhear

1.  Féadfaidh Ballstát a chinneadh, bunaithe ar fhianaise dhaingean eolaíoch, agus laistigh de dhá mhí tar éis speiceas coimhthíoch ionrach dá dtagraítear in Airteagal 16 a bhrath, gan bearta um dhíothú a chur i bhfeidhm má chomhlíontar ar a laghad ceann amháin de na coinníollacha seo a leanas:

(a) taispeántar nach bhfuil díothú indéanta go teicniúil ós rud é nach féidir na modhanna díothaithe atá ar fáil a chur i bhfeidhm sa timpeallacht ina bhfuil an speiceas coimhthíoch ionrach bunaithe;

(b) léiríonn anailís costais agus sochair ar bhonn na sonraí atá ar fáil le cinnteacht réasúnach go mbeidh na costais, san fhadtéarma, go heisceachtúil ard agus díréireach i ndáil le sochair an díothaithe;

(c) níl modhanna díothaithe ar fáil nó tá siad ar fáil ach tá tionchar diúltach an-tromchúiseach acu ar shláinte an duine nó ar an gcomhshaol nó ar speicis eile.

Tabharfaidh an Ballstát lena mbaineann fógra i scríbhinn don Choimisiún, gan mhoill, faoina chinneadh. Beidh an fhianaise ar fad dá dtagraítear i bpointe (a), i bpointe (b) agus i bpointe (c) den chéad fhomhír ag gabháil leis an bhfógra.

2.  Féadfaidh an Coimisiún a chinneadh, trí bhíthin gníomhartha cur chun feidhme, an cinneadh ar tugadh fógra ina leith i gcomhréir leis an dara fomhír de mhír 1 a dhiúltú, i gcás nach gcomhlíontar na coinníollacha a leagtar amach ansin.

3.  Glacfar na gníomhartha cur chun feidhme sin i gcomhréir leis an nós imeachta scrúdúcháin dá dtagraítear in Airteagal 27(2). Cuirfear na dréachtghníomhartha cur chun feidhme faoi bhráid an Choiste dá dtagraítear in Airteagal 27(1) laistigh de dhá mhí ó fhógra an Bhallstáit a fháil.

4.  Áiritheoidh na Ballstáit go mbeidh bearta imshrianta i bhfeidhm chun leathadh breise an speicis choimhthígh ionraigh go dtí Ballstáit eile a sheachaint, nuair nach gcuirfear bearta um dhíothú i bhfeidhm, de bhun mhír 1.

5.  I gcás ina ndiúltóidh an Coimisiún do chinneadh ar tugadh fógra ina leith i gcomhréir leis an dara fomhír de mhír 1 den Airteagal seo, déanfaidh an Ballstát lena mbaineann na bearta díothaithe dá dtagraítear in Airteagal 17 a chur i bhfeidhm gan mhoill.

6.  I gcás nach ndiúltóidh an Coimisiún do chinneadh ar tugadh fógra ina leith i gcomhréir leis an dara fomhír de mhír 1 den Airteagal seo, beidh an speiceas coimhthíoch ionrach faoi réir na mbeart bainistíochta dá dtagraítear in Airteagal 19.

1. Forbhreathnú

,
Teideal Rialáil
Article 18 1.

A Member State may, based on robust scientific evidence, decide, within two months of the detection of an invasive alien species referred to in Article 16, not to apply eradication measures if at least one of the following conditions is met:

(a) 

eradication is demonstrated to be technically unfeasible because the eradication methods available cannot be applied in the environment where the invasive alien species is established;

(b) 

a cost-benefit analysis demonstrates on the basis of the available data with reasonable certainty that the costs will, in the long term, be exceptionally high and disproportionate to the benefits of eradication;

(c) 

eradication methods are not available or are available but have very serious adverse impact on human health, the environment or other species.

The Member State concerned shall without delay notify the Commission of its decision in writing. The notification shall be accompanied by all the evidence referred to in points (a), (b) and (c) of the first subparagraph.

Article 18 2.
The Commission may decide, by means of implementing acts, to reject the decision notified in accordance with the second subparagraph of paragraph 1 where the conditions set out therein are not met.
Article 18 3.
Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 27(2). The draft implementing acts shall be submitted to the Committee referred to in Article 27(1) within two months of receipt of the Member State's notification.
Article 18 4.
Member States shall ensure that containment measures are in place to avoid further spread of the invasive alien species to other Member States when, pursuant to paragraph 1, no eradication measures are applied.
Article 18 5.
Where the Commission rejects a decision notified in accordance with the second subparagraph of paragraph 1 of this Article, the Member State concerned shall apply the eradication measures referred to in Article 17 without delay.
Article 18 6.
Where the Commission does not reject a decision notified in accordance with the second subparagraph of paragraph 1 of this Article, the invasive alien species shall be subject to the management measures referred to in Article 19.

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Caighdeáin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Caighdeáin ghaolmhara

Caighdeáin
Foinse Ceanglas
  • Builddate: 14.12.2019 00:00:00 -Doknr: CELEX:32014R1143
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.