+Section 1 General rules for the organisation of the markets and infrastructure access
---+Article 3 General principles
------+Article 3 (a)
------+Article 3 (b)
------+Article 3 (c)
------+Article 3 (d)
------+Article 3 (e)
------+Article 3 (f)
------+Article 3 (g)
------+Article 3 (h)
------+Article 3 (i)
------+Article 3 (j)
------+Article 3 (k)
------+Article 3 (l)
------+Article 3 (m)
------+Article 3 (n)
---+Article 4 Upscaling of renewable gas and low-carbon gas in coal and carbon-intensive regions
---+Article 5 Separation of regulatory asset bases
------+Article 5 1
------+Article 5 2
------+Article 5 3
------+Article 5 4
------+Article 5 5
------+Article 5 6
---+Article 6 Third-party access services concerning transmission system operators
------+Article 6 1
------+Article 6 2
------+Article 6 3
------+Article 6 4
------+Article 6 5
------+Article 6 6
------+Article 6 7
---+Article 7 Third-party access services concerning hydrogen network operators
------+Article 7 1
------+Article 7 2
------+Article 7 3
------+Article 7 4
------+Article 7 5
------+Article 7 6
------+Article 7 7
------+Article 7 8
------+Article 7 9
---+Article 8 Third-party access services concerning natural gas storage facilities, hydrogen terminals, LNG facilities and hydrogen storage facilities
------+Article 8 1
------+Article 8 2
------+Article 8 3
------+Article 8 4
------+Article 8 5
------+Article 8 6
------+Article 8 7
---+Article 9 Market-demand assessment for renewable gas and low-carbon gas by LNG system operators and natural gas storage system operators
---+Article 10 Principles of capacity-allocation mechanisms and congestion-management procedures concerning transmission system operators
------+Article 10 1
------+Article 10 2
------+Article 10 3
------+Article 10 4
---+Article 11 Principles of capacity-allocation mechanisms and congestion-management procedures concerning natural gas storage facilities, hydrogen terminals, hydrogen storage facilities and LNG facilities
------+Article 11 1
------+Article 11 2
------+Article 11 3
---+Article 12 Trading of capacity rights
---+Article 13 Balancing rules and imbalance charges
------+Article 13 1
------+Article 13 2
------+Article 13 3
------+Article 13 4
---+Article 14 Certification of transmission system operators and hydrogen transmission network operators
------+Article 14 1
------+Article 14 2
------+Article 14 3
------+Article 14 4
------+Article 14 5
------+Article 14 6
---+Article 15 Certification of natural gas storage system operators
------+Article 15 1
------+Article 15 2
------+Article 15 3
------+Article 15 4
------+Article 15 5
------+Article 15 6
------+Article 15 7
------+Article 15 8
------+Article 15 9
------+Article 15 10
------+Article 15 11
------+Article 15 12
------+Article 15 13
---+Article 16 Cooperation of transmission system operators
------+Article 16 1
------+Article 16 2

Section 1 General rules for the organisation of the markets and infrastructure access

Section 1 General rules for the organisation of the markets and infrastructure access

1. Panoramica

,
Titolo Regolamentazione
Article 3 General principles

Member States, regulatory authorities designated pursuant to Article 76 of Directive (EU) 2024/1788 (the ‘regulatory authorities’), operators of natural gas systems or hydrogen systems and delegated operators such as market area managers or booking platform operators shall ensure that markets for natural gas and hydrogen are operated in accordance with the following principles:

Article 4 Upscaling of renewable gas and low-carbon gas in coal and carbon-intensive regions

Article 4

Upscaling of renewable gas and low-carbon gas in coal and carbon-intensive regions

The Commission shall support and encourage the penetration of renewable gas and low-carbon gas, in particular hydrogen and biomethane, into the Union energy system, in particular in coal and carbon-intensive regions, with the aim of increasing the share of renewable gas in particular in industrial processes, district heating and energy storage and thereby accelerate the phase out of solid fossil fuels in industrial and district heating sectors. The Commission shall also support the conversion of fossil fuels to renewable and low-carbon hydrogen and biomethane, as well as the creation of a hydrogen-ready workforce.

Article 5 Separation of regulatory asset bases
Article 6 Third-party access services concerning transmission system operators
Article 7 Third-party access services concerning hydrogen network operators
Article 8 Third-party access services concerning natural gas storage facilities, hydrogen terminals, LNG facilities and hydrogen storage facilities
Article 9 Market-demand assessment for renewable gas and low-carbon gas by LNG system operators and natural gas storage system operators

Article 9

Market-demand assessment for renewable gas and low-carbon gas by LNG system operators and natural gas storage system operators

LNG system operators and natural gas storage system operators shall, at least every two years, assess market demand for new investments allowing the use of renewable gas and low-carbon gas, including hydrogen compounds, such as liquid ammonia and liquid organic hydrogen carriers, in the facilities. Those operators shall inform relevant regulatory authorities on the outcome of the market demand assessment. When planning new investments, LNG system operators and natural gas storage system operators shall assess market demand in view of facilitating the usage of renewable gas and low-carbon gas in their facilities and take into account security of supply. LNG system operators and natural gas storage system operators shall make publicly available any plans regarding new investments allowing the usage of renewable gas and low-carbon gas in their facilities.

Article 10 Principles of capacity-allocation mechanisms and congestion-management procedures concerning transmission system operators
Article 11 Principles of capacity-allocation mechanisms and congestion-management procedures concerning natural gas storage facilities, hydrogen terminals, hydrogen storage facilities and LNG facilities
Article 12 Trading of capacity rights

Article 12

Trading of capacity rights

Each transmission system operator, natural gas storage system operator, LNG system operator, hydrogen transmission network operator, hydrogen terminal operator and hydrogen storage operator shall take reasonable steps to allow capacity rights to be freely tradable and to facilitate such trade in a transparent and non-discriminatory manner. Every such operator shall develop harmonised contracts and procedures for transport, LNG facilities, hydrogen terminals, natural gas storage facilities and hydrogen storage facilities on the primary market to facilitate secondary trade of capacity and shall recognise the transfer of primary capacity rights where notified by system users.

The harmonised contracts and procedures shall be notified to the regulatory authorities.

Article 13 Balancing rules and imbalance charges
Article 14 Certification of transmission system operators and hydrogen transmission network operators
Article 15 Certification of natural gas storage system operators
Article 16 Cooperation of transmission system operators

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Standard correlati

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Standard correlati

Standard
Fonte Requisito