+251. A deferral schedule is defined by different components: a. the proportion of the variable …
|
251. A deferral schedule is defined by different components: a. the proportion of the variable …
A deferral schedule is defined by different components: - a. the proportion of the variable remuneration that is being deferred (section 15.2);
- b. the length of the deferral period (section 15.2);
- c. the speed at which the deferred remuneration vests, including the time span from the end of the accrual period until the vesting of the first deferred amount (section 15.3).
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- EBA - Published by the European Banking Authority at https://www.eba.europa.eu/
|