|
+Article 18 10. |
Article 18 10.All shipments of waste referred to in Article 4(4) and (5) shall be subject to the requirement of the conclusion of a contract between the person who arranges the shipment and the consignee for the recovery of the waste. If the consignee is not the operator of the facility, the contract shall also be signed by the operator of the facility. The contract referred to in the first subparagraph shall be concluded and effective at the latest by the time the Annex VII document is completed in accordance with paragraph 5 and shall remain effective for the duration of the shipment until a certificate is issued in accordance with paragraph 9. The contract shall be consistent with the corresponding Annex VII documents and at least contain information on the person who arranges the shipment, the consignee and the facility, the identity of the persons representing each party, the description of the waste, the waste identification codes, the quantity of waste covered by the contract, the recovery operation and the period of validity of the contract. The contract shall include an obligation that where the shipment of waste or its recovery cannot be completed as intended or where it has been effected as an illegal shipment, the person who arranges the shipment or, where that person is not in a position to ensure completion of the shipment of waste or its recovery, the consignee, is to take the waste back or ensure that it is recovered in an alternative way, and, if necessary, that it is stored in the meantime. 1. Overview
1.1 References1.2 Identified Requirements1.3 Related Standards2. Identified Requirements
3. Related Standards
|