|
+Article 5 2 |
Article 5 22. Member States shall take the necessary measures to ensure that, as of 1 January 2024, no existing medium combustion plant with a rated thermal input greater than 5 MW is operated without a permit or without being registered. Member States shall take the necessary measures to ensure that, as of 1 January 2029, no existing medium combustion plant with a rated thermal input of less than or equal to 5 MW is operated without a permit or without being registered. 1. Forbhreathnú
1.1 Tagairtí1.2 Ceanglais aitheanta1.3 Caighdeáin ghaolmhara2. Ceanglais aitheanta
3. Caighdeáin ghaolmhara
|