+Article 5 2

Article 5 2

2.   Member States shall take the necessary measures to ensure that, as of 1 January 2024, no existing medium combustion plant with a rated thermal input greater than 5 MW is operated without a permit or without being registered.

Member States shall take the necessary measures to ensure that, as of 1 January 2029, no existing medium combustion plant with a rated thermal input of less than or equal to 5 MW is operated without a permit or without being registered.