+Article 5 2

Article 5 2

2.   Member States shall take the necessary measures to ensure that, as of 1 January 2024, no existing medium combustion plant with a rated thermal input greater than 5 MW is operated without a permit or without being registered.

Member States shall take the necessary measures to ensure that, as of 1 January 2029, no existing medium combustion plant with a rated thermal input of less than or equal to 5 MW is operated without a permit or without being registered.

1. Pregled

,
Naslov Regulativa

1.1 Reference

1.2 Utvrđeni zahtjevi

1.3 Povezani standardi

2. Utvrđeni zahtjevi

Zahtjevi
Izvor Zahtjev

3. Povezani standardi

Standardi
Izvor Zahtjev