+▼M1 DIRECTIVE 2010/75/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 24 November 2010 on industrial and livestock rearing emissions (integrated pollution prevention and control) ▼B (Recast) (Text with EEA relevance)
---+CHAPTER I COMMON PROVISIONS
------+Article 1 Subject matter
------+Article 2 Scope
---------+Article 2 1.
---------+Article 2 2.
------+Article 3 Definitions
------+Article 4 Obligation to hold a permit
---------+Article 4 1.
---------+Article 4 2.
---------+Article 4 3.
------+Article 5 Granting of a permit
---------+Article 5 1.
---------+Article 5 2.
---------+Article 5 3.
---------+Article 5 4.
------+Article 6 General binding rules
------+Article 7 Incidents and accidents
------+Article 8 Non-compliance
---------+Article 8 1.
---------+Article 8 2.
---------+Article 8 3.
---------+Article 8 4.
---------+Article 8 5.
---------+Article 8 6.
------+Article 9 Emission of greenhouse gases
---------+Article 9 1.
---------+Article 9 2.
---------+Article 9 3.
---------+Article 9 4.
---+CHAPTER II PROVISIONS FOR ACTIVITIES LISTED IN ANNEX I
------+Article 10 Scope
------+Article 11 General principles governing the basic obligations of the operator
------+Article 12 Applications for permits
---------+Article 12 1.
---------+Article 12 2.
------+Article 13 BAT reference documents and exchange of information
---------+Article 13 1.
---------+Article 13 1a.
---------+Article 13 2.
---------+Article 13 3.
---------+Article 13 3a.
---------+Article 13 4.
---------+Article 13 5.
---------+Article 13 6.
---------+Article 13 7.
------+Article 14 Permit conditions
---------+Article 14 1.
---------+Article 14 2.
---------+Article 14 3.
---------+Article 14 4.
---------+Article 14 5.
---------+Article 14 6.
---------+Article 14 7.
------+Article 14a Environmental management system
---------+Article 14a 1.
---------+Article 14a 2.
---------+Article 14a 3.
---------+Article 14a 4.
------+Article 15 Emission limit values, environmental performance limit values, equivalent parameters and technical measures
---------+Article 15 1.
---------+Article 15 2.
---------+Article 15 3.
---------+Article 15 4.
---------+Article 15 5.
---------+Article 15 6.
---------+Article 15 7.
------+Article 15a Compliance assessment
---------+Article 15a 1.
---------+Article 15a 2.
---------+Article 15a 3.
------+Article 16 Monitoring requirements
---------+Article 16 1.
---------+Article 16 2.
---------+Article 16 3.
---------+Article 16 4.
------+Article 17 General binding rules for activities listed in Annex I
---------+Article 17 1.
---------+Article 17 2.
---------+Article 17 3.
---------+Article 17 4.
------+Article 18 Environmental quality standards
------+Article 19 Developments in best available techniques
------+Article 20 Changes by operators to installations
---------+Article 20 1.
---------+Article 20 2.
---------+Article 20 3.
------+Article 21 Reconsideration and updating of permit conditions by the competent authority
---------+Article 21 1.
---------+Article 21 2.
---------+Article 21 3.
---------+Article 21 4.
---------+Article 21 5.
------+Article 22 Site closure
---------+Article 22 1.
---------+Article 22 2.
---------+Article 22 3.
---------+Article 22 4.
------+Article 23 Environmental inspections
---------+Article 23 1.
---------+Article 23 2.
---------+Article 23 3.
---------+Article 23 4.
---------+Article 23 5.
---------+Article 23 6.
------+Article 24 Access to information and public participation in the permit procedure
---------+Article 24 1.
---------+Article 24 2.
---------+Article 24 3.
---------+Article 24 4.
------+Article 25 Access to justice
---------+Article 25 1.
---------+Article 25 2.
---------+Article 25 3.
---------+Article 25 4.
---------+Article 25 5.
------+Article 26 Transboundary effects
---------+Article 26 1.
---------+Article 26 2.
---------+Article 26 3.
---------+Article 26 4.
---+CHAPTER IIA ENABLING AND PROMOTING INNOVATION
------+Article 27 Emerging techniques
------+Article 27a Innovation centre for industrial transformation and emissions
---------+Article 27a 1.
---------+Article 27a 2.
---------+Article 27a 3.
---------+Article 27a 4.
------+Article 27b Testing of emerging techniques
------+Article 27c Emission levels and indicative environmental performance values associated with emerging techniques
------+Article 27d Transformation towards a clean, circular and climate-neutral industry
---------+Article 27d 1.
---------+Article 27d 2.
---------+Article 27d 3.
---------+Article 27d 4.
---------+Article 27d 5.
------+Article 27e Deep industrial transformation
---------+Article 27e 1.
---------+Article 27e 2.
---+CHAPTER III SPECIAL PROVISIONS FOR COMBUSTION PLANTS
------+Article 28 Scope
------+Article 29 Aggregation rules
---------+Article 29 1.
---------+Article 29 2.
---------+Article 29 3.
------+Article 30 Emission limit values
---------+Article 30 1.
---------+Article 30 2.
---------+Article 30 3.
---------+Article 30 4.
---------+Article 30 5.
---------+Article 30 6.
---------+Article 30 7.
---------+Article 30 8.
---------+Article 30 9.
------+Article 31 Desulphurisation rate
---------+Article 31 1.
---------+Article 31 2.
---------+Article 31 3.
------+Article 32 Transitional National Plan
---------+Article 32 1.
---------+Article 32 2.
---------+Article 32 3.
---------+Article 32 4.
---------+Article 32 5.
---------+Article 32 6.
------+Article 33 Limited life time derogation
---------+Article 33 1.
---------+Article 33 2.
---------+Article 33 3.
---------+Article 33 4.
------+Article 34 Small isolated systems
---------+Article 34 1.
---------+Article 34 2.
---------+Article 34 3.
------+Article 34a Combustion plants that are part of a small isolated system
---------+Article 34a 1.
---------+Article 34a 2.
---------+Article 34a 3.
---------+Article 34a 4.
---------+Article 34a 5.
---------+Article 34a 6.
------+Article 35 District heating plants
---------+Article 35 1.
---------+Article 35 2.
------+Article 36 Geological storage of carbon dioxide
---------+Article 36 1.
---------+Article 36 2.
------+Article 37 Malfunction or breakdown of the abatement equipment
---------+Article 37 1.
---------+Article 37 2.
------+Article 38 Monitoring of emissions into air
---------+Article 38 1.
---------+Article 38 2.
---------+Article 38 3.
---------+Article 38 4.
------+Article 39 Compliance with emission limit values
------+Article 40 Multi-fuel firing combustion plants
---------+Article 40 1.
---------+Article 40 2.
---------+Article 40 3.
------+Article 41 Implementing rules
---+CHAPTER IV SPECIAL PROVISIONS FOR WASTE INCINERATION PLANTS AND WASTE CO-INCINERATION PLANTS
------+Article 42 Scope
---------+Article 42 1.
---------+Article 42 2.
------+Article 43 Definition of residue
------+Article 44 Applications for permits
------+Article 45 Permit conditions
---------+Article 45 1.
---------+Article 45 2.
---------+Article 45 3.
---------+Article 45 4.
------+Article 46 Control of emissions
---------+Article 46 1.
---------+Article 46 2.
---------+Article 46 3.
---------+Article 46 4.
---------+Article 46 5.
---------+Article 46 6.
------+Article 47 Breakdown
------+Article 48 Monitoring of emissions
---------+Article 48 1.
---------+Article 48 2.
---------+Article 48 3.
---------+Article 48 4.
---------+Article 48 5.
------+Article 49 Compliance with emission limit values
------+Article 50 Operating conditions
---------+Article 50 1.
---------+Article 50 2.
---------+Article 50 3.
---------+Article 50 4.
---------+Article 50 5.
---------+Article 50 6.
---------+Article 50 7.
------+Article 51 Authorisation to change operating conditions
---------+Article 51 1.
---------+Article 51 2.
---------+Article 51 3.
---------+Article 51 4.
------+Article 52 Delivery and reception of waste
---------+Article 52 1.
---------+Article 52 2.
---------+Article 52 3.
---------+Article 52 4.
---------+Article 52 5.
------+Article 53 Residues
---------+Article 53 1.
---------+Article 53 2.
---------+Article 53 3.
------+Article 54 Substantial change
------+Article 55 Reporting and public information on waste incineration plants and waste co-incineration plants
---------+Article 55 1.
---------+Article 55 2.
---------+Article 55 3.
---+CHAPTER V SPECIAL PROVISIONS FOR INSTALLATIONS AND ACTIVITIES USING ORGANIC SOLVENTS
------+Article 56 Scope
------+Article 57 Definitions
------+Article 58 Substitution of hazardous substances
------+Article 59 Control of emissions
---------+Article 59 1.
---------+Article 59 2.
---------+Article 59 3.
---------+Article 59 4.
---------+Article 59 5.
---------+Article 59 6.
---------+Article 59 7.
------+Article 60 Monitoring of emissions
------+Article 61 Compliance with emission limit values
------+Article 62 Reporting on compliance
------+Article 63 Substantial change to existing installations
---------+Article 63 1.
---------+Article 63 2.
---------+Article 63 3.
------+Article 64 Exchange of information on substitution of organic solvents
------+Article 65 Access to information
---------+Article 65 1.
---------+Article 65 2.
---------+Article 65 3.
---+CHAPTER VI SPECIAL PROVISIONS FOR INSTALLATIONS PRODUCING TITANIUM DIOXIDE
------+Article 66 Scope
------+Article 67 Prohibition of the disposal of waste
------+Article 68 Control of emissions into water
------+Article 69 Prevention and control of emissions into air
---------+Article 69 1.
---------+Article 69 2.
------+Article 70 Monitoring of emissions
---------+Article 70 1.
---------+Article 70 2.
---------+Article 70 3.
---+CHAPTER VIA SPECIAL PROVISIONS FOR REARING POULTRY AND PIGS
------+Article 70a Scope
------+Article 70b Aggregation rule
---------+Article 70b 1.
---------+Article 70b 2.
------+Article 70c Permits and registrations
---------+Article 70c 1.
---------+Article 70c 2.
---------+Article 70c 3.
---------+Article 70c 4.
---------+Article 70c 5.
------+Article 70d Obligations of the operator
---------+Article 70d 1.
---------+Article 70d 2.
---------+Article 70d 3.
------+Article 70e Monitoring
---------+Article 70e 1.
---------+Article 70e 2.
---------+Article 70e 3.
------+Article 70f Non-compliance
---------+Article 70f 1.
---------+Article 70f 2.
---------+Article 70f 3.
------+Article 70g Public information and participation
---------+Article 70g 1.
---------+Article 70g 2.
------+Article 70h Access to justice
---------+Article 70h 1.
---------+Article 70h 2.
------+Article 70i Uniform conditions for operating rules
---------+Article 70i 1.
---------+Article 70i 2.
---------+Article 70i 3.
---+CHAPTER VII COMMITTEE, TRANSITIONAL AND FINAL PROVISIONS
------+Article 71 Competent authorities
------+Article 72 Reporting by Member States
---------+Article 72 1.
---------+Article 72 2.
---------+Article 72 3.
---------+Article 72 4.
------+Article 73 Review
---------+Article 73 1.
---------+Article 73 2.
---------+Article 73 3.
---------+Article 73 4.
------+Article 74 Amendments of Annexes
---------+Article 74 1.
---------+Article 74 2.
------+Article 75 Committee procedure
---------+Article 75 1.
---------+Article 75 2.
------+Article 76 Exercise of the delegation
---------+Article 76 1.
---------+Article 76 2.
---------+Article 76 3.
---------+Article 76 4.
---------+Article 76 5.
---------+Article 76 6.
------+Article 79 Penalties
---------+Article 79 1.
---------+Article 79 2.
---------+Article 79 3.
---------+Article 79 4.
------+Article 79a Compensation
---------+Article 79a 1.
---------+Article 79a 2.
---------+Article 79a 3.
------+Article 80 Transposition
---------+Article 80 1.
---------+Article 80 2.
------+Article 81 Repeal
---------+Article 81 1.
---------+Article 81 2.
---------+Article 81 3.
------+Article 82 Transitional provisions
---------+Article 82 1.
---------+Article 82 2.
---------+Article 82 3.
---------+Article 82 4.
---------+Article 82 5.
---------+Article 82 6.
---------+Article 82 7.
---------+Article 82 8.
---------+Article 82 9.
------+Article 83 Entry into force
------+Article 84 Addressees
---+ANNEX I Categories of activities referred to in Article 10
---+ANNEX Ia Activities referred to in Article 70a
---+ANNEX II Principles to be complied with when granting a derogation referred to in Article 15(5)
---+ANNEX III Criteria for determining best available techniques
---+ANNEX IV Public participation in decision-making
---+ANNEX V Technical provisions relating to combustion plants
---+ANNEX VI Technical provisions relating to waste incineration plants and waste co-incineration plants
---+ANNEX VII Technical provisions relating to installations and activities using organic solvents
---+ANNEX VIII Technical provisions relating to installations producing titanium dioxide
---+ANNEX IX
---+ANNEX X Correlation Table
English - European Union - Environment -

▼M1 DIRECTIVE 2010/75/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 24 November 2010 on industrial and livestock rearing emissions (integrated pollution prevention and control) ▼B (Recast) (Text with EEA relevance)

▼M1

DIRECTIVE 2010/75/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

of 24 November 2010

on industrial and livestock rearing emissions (integrated pollution prevention and control)

▼B

(Recast)

(Text with EEA relevance)

1. Apžvalga

,
Pavadinimas Reguliavimas
CHAPTER I COMMON PROVISIONS CHAPTER I COMMON PROVISIONS
CHAPTER II PROVISIONS FOR ACTIVITIES LISTED IN ANNEX I CHAPTER II PROVISIONS FOR ACTIVITIES LISTED IN ANNEX I
CHAPTER IIA ENABLING AND PROMOTING INNOVATION CHAPTER IIA ENABLING AND PROMOTING INNOVATION
CHAPTER III SPECIAL PROVISIONS FOR COMBUSTION PLANTS CHAPTER III SPECIAL PROVISIONS FOR COMBUSTION PLANTS
CHAPTER IV SPECIAL PROVISIONS FOR WASTE INCINERATION PLANTS AND WASTE CO-INCINERATION PLANTS CHAPTER IV SPECIAL PROVISIONS FOR WASTE INCINERATION PLANTS AND WASTE CO-INCINERATION PLANTS
CHAPTER V SPECIAL PROVISIONS FOR INSTALLATIONS AND ACTIVITIES USING ORGANIC SOLVENTS CHAPTER V SPECIAL PROVISIONS FOR INSTALLATIONS AND ACTIVITIES USING ORGANIC SOLVENTS
CHAPTER VI SPECIAL PROVISIONS FOR INSTALLATIONS PRODUCING TITANIUM DIOXIDE CHAPTER VI SPECIAL PROVISIONS FOR INSTALLATIONS PRODUCING TITANIUM DIOXIDE
CHAPTER VIA SPECIAL PROVISIONS FOR REARING POULTRY AND PIGS CHAPTER VIA SPECIAL PROVISIONS FOR REARING POULTRY AND PIGS
CHAPTER VII COMMITTEE, TRANSITIONAL AND FINAL PROVISIONS CHAPTER VII COMMITTEE, TRANSITIONAL AND FINAL PROVISIONS
ANNEX I Categories of activities referred to in Article 10




ANNEX I

Categories of activities referred to in Article 10

The threshold values given below generally refer to production capacities or outputs. Where several activities falling under the same activity description containing a threshold are operated in the same installation, the capacities of such activities are added together. For waste management activities, this calculation shall apply at the level of activities 5.1, 5.3(a) and 5.3(b).

The Commission shall establish guidance on:

(a) 

the relationship between waste management activities described in this Annex and those described in Annexes I and II to Directive 2008/98/EC; and

(b) 

the interpretation of the term ‘industrial scale’ regarding the description of chemical industry activities described in this Annex.

1.   Energy industries

1.1.

Combustion of fuels in installations with a total rated thermal input of 50 MW or more

1.2.

Refining of mineral oil and gas

1.3.

Production of coke

▼M1

1.4.

Gasification, liquefaction or pyrolysis of:

(a) 

coal;

(b) 

other fuels in installations with a total rated thermal input of 20 MW or more.

▼B

2.   Production and processing of metals

2.1.

Metal ore (including sulphide ore) roasting or sintering

2.2.

Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour

▼M1

2.3.

Processing of ferrous metals:

(a) 

operation of hot-rolling mills with a capacity exceeding 20 tonnes of crude steel per hour;

(aa) 

operation of cold-rolling mills with a capacity exceeding 10 tonnes of crude steel per hour;

(b) 

operation of smitheries with hammers the energy of which exceeds 50 kilojoule per hammer;

(ba) 

operation of smitheries with forging presses the force of which exceeds 30 mega-newton (MN) per press;

(c) 

application of protective fused metal coats with an input exceeding 2 tonnes of crude steel per hour.

▼B

2.4.

Operation of ferrous metal foundries with a production capacity exceeding 20 tonnes per day

2.5.

Processing of non-ferrous metals:

(a) 

production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes;

(b) 

melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals.

2.6.

Surface treatment of metals or plastic materials using an electrolytic or chemical process where the volume of the treatment vats exceeds 30 m3

▼M1

2.7.

Manufacture of batteries, other than exclusively assembling, with a production capacity of 15 000  tonnes of battery cells (cathode, anode, electrolyte, separator, capsule) or more per year.

▼B

3.   Mineral industry

3.1.

Production of cement, lime and magnesium oxide:

(a) 

production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day;

(b) 

production of lime in kilns with a production capacity exceeding 50 tonnes per day;

(c) 

production of magnesium oxide in kilns with a production capacity exceeding 50 tonnes per day.

3.2.

Production of asbestos or the manufacture of asbestos-based products

3.3.

Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day

3.4.

Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day

▼M1

3.5.

Manufacture of ceramic products by firing, in particular roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain with:

(a) 

a production capacity exceeding 75 tonnes per day; and/or

(b) 

a kiln capacity exceeding 4 m3 and a setting density per kiln exceeding 300 kg/m3.

▼M1

3.6.

Extraction including on-site treatment operations, such as comminution, size control, beneficiation and upgrading, of the following ores on an industrial scale:

bauxite, chromium, cobalt, copper, gold, iron, lead, lithium, manganese, nickel, palladium, platinum, tin, tungsten and zinc.

▼B

4.   Chemical industry

For the purpose of this section, production within the meaning of the categories of activities contained in this section means the production on an industrial scale by chemical or biological processing of substances or groups of substances listed in points 4.1 to 4.6

4.1.

Production of organic chemicals, such as:

(a) 

simple hydrocarbons (linear or cyclic, saturated or unsaturated, aliphatic or aromatic);

(b) 

oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters and mixtures of esters, acetates, ethers, peroxides and epoxy resins;

(c) 

sulphurous hydrocarbons;

(d) 

nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates;

(e) 

phosphorus-containing hydrocarbons;

(f) 

halogenic hydrocarbons;

(g) 

organometallic compounds;

(h) 

plastic materials (polymers, synthetic fibres and cellulose-based fibres);

(i) 

synthetic rubbers;

(j) 

dyes and pigments;

(k) 

surface-active agents and surfactants.

4.2.

Production of inorganic chemicals, such as:

▼M1

(a) 

gases, such as ammonia, chlorine or hydrogen chloride, fluorine or hydrogen fluoride, carbon oxides, sulphur compounds, nitrogen oxides, hydrogen except when produced by electrolysis of water, sulphur dioxide, carbonyl chloride;

▼B

(b) 

acids, such as chromic acid, hydrofluoric acid, phosphoric acid, nitric acid, hydrochloric acid, sulphuric acid, oleum, sulphurous acids;

(c) 

bases, such as ammonium hydroxide, potassium hydroxide, sodium hydroxide;

(d) 

salts, such as ammonium chloride, potassium chlorate, potassium carbonate, sodium carbonate, perborate, silver nitrate;

(e) 

non-metals, metal oxides or other inorganic compounds such as calcium carbide, silicon, silicon carbide.

4.3.

Production of phosphorous-, nitrogen- or potassium-based fertilisers (simple or compound fertilisers)

4.4.

Production of plant protection products or of biocides

4.5.

Production of pharmaceutical products including intermediates

4.6.

Production of explosives

5.   Waste management

5.1.

Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities:

(a) 

biological treatment;

(b) 

physico-chemical treatment;

(c) 

blending or mixing prior to submission to any of the other activities listed in points 5.1 and 5.2;

(d) 

repackaging prior to submission to any of the other activities listed in points 5.1 and 5.2;

(e) 

solvent reclamation/regeneration;

(f) 

recycling/reclamation of inorganic materials other than metals or metal compounds;

(g) 

regeneration of acids or bases;

(h) 

recovery of components used for pollution abatement;

(i) 

recovery of components from catalysts;

(j) 

oil re-refining or other reuses of oil;

(k) 

surface impoundment.

5.2.

Disposal or recovery of waste in waste incineration plants or in waste co-incineration plants:

(a) 

for non-hazardous waste with a capacity exceeding 3 tonnes per hour;

(b) 

for hazardous waste with a capacity exceeding 10 tonnes per day.

▼M1

5.3.

(a) 

Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC ( 23 ):

(i) 

biological treatment, such as anaerobic digestion or co-digestion;

(ii) 

physico-chemical treatment;

(iii) 

pre-treatment of waste for incineration or co-incineration;

(iv) 

treatment of slags and ashes;

(v) 

treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components.

(b) 

Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC:

(i) 

biological treatment, such as anaerobic digestion;

(ii) 

pre-treatment of waste for incineration or co-incineration;

(iii) 

treatment of slags and ashes;

(iv) 

treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components.

When the only waste treatment activity carried out is anaerobic digestion, the capacity threshold for this activity shall be 100 tonnes per day.

▼B

5.4.

Landfills, as defined in Article 2(g) of Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste ( 24 ), receiving more than 10 tonnes of waste per day or with a total capacity exceeding 25 000  tonnes, excluding landfills of inert waste

5.5.

Temporary storage of hazardous waste not covered under point 5.4 pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated

5.6.

Underground storage of hazardous waste with a total capacity exceeding 50 tonnes

6.   Other activities

6.1.

Production in industrial installations of:

(a) 

pulp from timber or other fibrous materials;

(b) 

paper or card board with a production capacity exceeding 20 tonnes per day;

(c) 

one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day.

▼M1

6.2.

Pre-treatment (operations such as washing, bleaching, mercerisation), dyeing or finishing of textile fibres or textiles where the treatment capacity exceeds 10 tonnes per day.

▼B

6.3.

Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day

6.4.

(a) 

Operating slaughterhouses with a carcass production capacity greater than 50 tonnes per day

(b) 

Treatment and processing, other than exclusively packaging, of the following raw materials, whether previously processed or unprocessed, intended for the production of food or feed from:

(i) 

only animal raw materials (other than exclusively milk) with a finished product production capacity greater than 75 tonnes per day;

(ii) 

only vegetable raw materials with a finished product production capacity greater than 300 tonnes per day or 600 tonnes per day where the installation operates for a period of no more than 90 consecutive days in any year;

(iii) 

animal and vegetable raw materials, both in combined and separate products, with a finished product production capacity in tonnes per day greater than:

— 
75 if A is equal to 10 or more; or,
— 
[300- (22,5 × A)] in any other case,

where ‘A’ is the portion of animal material (in percent of weight) of the finished product production capacity.

Packaging shall not be included in the final weight of the product.

This subsection shall not apply where the raw material is milk only.

image

(c) 

Treatment and processing of milk only, the quantity of milk received being greater than 200 tonnes per day (average value on an annual basis).

▼M1

6.5.

Disposal or recycling of animal carcasses or animal by-products with a treatment capacity exceeding 10 tonnes per day.

6.6.

Electrolysis of water for production of hydrogen where the production capacity exceeds 50 tonnes per day.

▼B

6.7.

Surface treatment of substances, objects or products using organic solvents, in particular for dressing, printing, coating, degreasing, waterproofing, sizing, painting, cleaning or impregnating, with an organic solvent consumption capacity of more than 150 kg per hour or more than 200 tonnes per year

6.8.

Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation

6.9.

Capture of CO2 streams from installations covered by this Directive for the purposes of geological storage pursuant to Directive 2009/31/EC

6.10.

Preservation of wood and wood products with chemicals with a production capacity exceeding 75 m3 per day other than exclusively treating against sapstain

6.11.

Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation covered by Chapter II

ANNEX Ia Activities referred to in Article 70a




ANNEX Ia

Activities referred to in Article 70a

Installations fall within the scope of this annex if they fall within one or more of the following activity categories:

1. 

Rearing of pigs representing 350 LSU or more, excluding rearing activities that are carried out under organic production regimes in accordance with Regulation (EU) 2018/848, or where the stocking density is less than 2 LSU/hectare used only for grazing or growing fodder or forage used for feeding the animals and the animals are reared outside for a significant amount of time in a year or seasonally reared outside.

2. 

Rearing of only laying hens representing 300 LSU or more, or rearing of only other poultry categories representing 280 LSU or more. In installations rearing a mix of poultry including laying hens, the threshold shall be 280 LSU and the capacity shall be calculated using 0,93 as weighting factor ( 25 ) for laying hens.

3. 

Rearing of any mix of pigs or poultry representing 380 LSU or more, excluding rearing of pigs in installations operating under organic production regimes in accordance with Regulation (EU) 2018/848, or where the stocking density is less than 2 LSU/hectare used only for grazing or growing fodder or forage used for feeding the animals and the animals are reared outside for a significant amount of time in a year or seasonally reared outside.

The LSU level of an installation is calculated using the following conversion rates:

Pigs:

Breeding sows ≥ 50 kg … 0,500

Piglets ≤ 20 kg … 0,027

Other pigs … 0,300

Poultry:

Broilers … 0,007

Laying hens … 0,014

Turkeys … 0,030

Ducks … 0,010

Geese … 0,020

Ostriches … 0,350

Other poultry fowls … 0,001

ANNEX II Principles to be complied with when granting a derogation referred to in Article 15(5)




ANNEX II

Principles to be complied with when granting a derogation referred to in Article 15(5)

Derogations provided in accordance with Article 15(5) shall respect the following principles:

1.    Costs

1.1. Costs referred to in Article 15(5) shall be the costs of complying with the emission levels associated with best available techniques and include both capital costs and operating costs. Wider social or economic costs shall not be included.

1.2. The evaluation of the costs shall be quantitative, and supported by a qualitative assessment.

1.3. Costs taken into account in the evaluation shall:

(a) 

represent net value costs, after deduction of any financial benefits from applying best available techniques;

(b) 

include the cost of accessing financial capital required to finance the best available techniques;

(c) 

be calculated using a discount rate to take account of differences in monetary value over time.

1.4. The application for a derogation shall clearly identify the source of the costs and the methods used to calculate them, including the discount rate mentioned in point 1.3(c) and the estimation of uncertainties associated with the costs evaluation.

1.5. Costs evaluated by the operator shall be assessed by the competent authority, based on information from other sources such as technology providers, peer-reviewed research, expert judgements or data from other installations where best available techniques were recently installed.

2.    Environmental benefits

2.1. Environmental benefits referred to in Article 15(6) shall be environmental benefits of complying with the emission levels associated with best available techniques.

2.2. The evaluation of environmental benefits shall be quantitative (in monetary terms) and supported by a qualitative assessment. Established pollutant damage costs shall be used where available.

2.3. The evaluation of environmental benefits shall consider a discount rate applied to any monetised benefits which addresses differences in value to society over time.

2.4. The application for a derogation shall clearly identify the source of the environmental benefits information and the methods used to calculate the environmental benefits, including the discount rate mentioned in point 1.3(c) and the estimate of uncertainties associated with the evaluation of the environmental benefits.

2.5. Environmental benefits evaluated by the operator shall be assessed by the competent authority, based on expert judgement or data from other installations where the best available techniques were recently installed.

3.    Disproportionality of costs compared to environmental benefits

3.1. For the purpose of determining if there is a disproportionality, the costs of complying with the emission levels associated with best available techniques, and the benefits of such compliance, shall be compared.

3.2. The comparison mechanism shall include the following elements:

(a) 

a method to address uncertainties in evaluating costs and environmental benefits;

(b) 

a specification of the margin by which the costs should exceed the environmental benefits.

ANNEX III Criteria for determining best available techniques




ANNEX III

Criteria for determining best available techniques

1.

the use of low-waste technology;

▼M1

2.

the use of less hazardous substances, including less use of substances of very high concern;

▼B

3.

the furthering of recovery and recycling of substances generated and used in the process and of waste, where appropriate;

4.

comparable processes, facilities or methods of operation which have been tried with success on an industrial scale;

▼M1

5.

technological advances, including digital tools, and changes in scientific knowledge and understanding;

▼B

6.

the nature, effects and volume of the emissions concerned;

7.

the commissioning dates for new or existing installations;

8.

the length of time needed to introduce the best available technique;

▼M1

9.

the consumption and nature of raw materials, including water, used in the process and resource efficiency and reuse and decarbonisation;

10.

the need to prevent or reduce to a minimum the overall impact of the emissions on the environment, including biodiversity, and the risks to it;

11.

the need to prevent accidents and to minimise the consequences for the environment and human health;

▼B

12.

information published by public international organisations.

ANNEX IV Public participation in decision-making




ANNEX IV

Public participation in decision-making

1.

▼M1

The public shall be informed through public notices and on a webpage of the following matters early in the procedure for the taking of a decision or, at the latest, as soon as the information can reasonably be provided:

▼B

(a) 

the application for a permit or, as the case may be, the proposal for the updating of a permit or of permit conditions in accordance with Article 21, including the description of the elements listed in Article 12(1);

(b) 

where applicable, the fact that a decision is subject to a national or transboundary environmental impact assessment or to consultations between Member States in accordance with Article 26;

(c) 

details of the competent authorities responsible for taking the decision, those from which relevant information can be obtained, those to which comments or questions can be submitted, and details of the time schedule for transmitting comments or questions;

(d) 

the nature of possible decisions or, where there is one, the draft decision;

(e) 

where applicable, the details relating to a proposal for the updating of a permit or of permit conditions;

(f) 

an indication of the times and places where, or means by which, the relevant information will be made available;

(g) 

details of the arrangements for public participation and consultation made pursuant to point 5.

2.

Member States shall ensure that, within appropriate time-frames, the following is made available to the public concerned:

(a) 

in accordance with national law, the main reports and advice issued to the competent authority or authorities at the time when the public concerned were informed in accordance with point 1;

(b) 

in accordance with Directive 2003/4/EC, information other than that referred to in point 1 which is relevant for the decision in accordance with Article 5 of this Directive and which only becomes available after the time the public concerned was informed in accordance with point 1.

▼M1

3.

The members of the public concerned shall be given early and effective opportunity to express comments and opinions to the competent authority before a decision is taken.

▼B

4.

The results of the consultations held pursuant to this Annex must be taken into due account in the taking of a decision.

▼M1

5.

Reasonable timeframes for the different phases shall be provided, allowing sufficient time to inform the public and for the members of the public concerned to prepare and participate effectively in environmental decision-making subject to this Annex.

▼B

ANNEX V Technical provisions relating to combustion plants




ANNEX V

Technical provisions relating to combustion plants

PART 1

Emission limit values for combustion plants referred to in Article 30(2)

1.

All emission limit values shall be calculated at a temperature of 273,15 K, a pressure of 101,3 kPa and after correction for the water vapour content of the waste gases and at a standardised O2 content of 6 % for solid fuels, 3 % for combustion plants, other than gas turbines and gas engines using liquid and gaseous fuels and 15 % for gas turbines and gas engines.

2.

Emission limit values (mg/Nm3) for SO2 for combustion plants using solid or liquid fuels with the exception of gas turbines and gas engines



Total rated thermal input (MW)

Coal and lignite and other solid fuels

Biomass

Peat

Liquid fuels

50-100

400

200

300

350

100-300

250

200

300

250

> 300

200

200

200

200

Combustion plants, using solid fuels which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003, and which do not operate more than 1 500 operating hours per year as a rolling average over a period of 5 years, shall be subject to an emission limit value for SO2 of 800 mg/Nm3.

Combustion plants using liquid fuels, which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003, and which do not operate more than 1 500 operating hours per year as a rolling average over a period of 5 years, shall be subject to an emission limit value for SO2 of 850 mg/Nm3 in case of plants with a total rated thermal input not exceeding 300 MW and of 400 mg/Nm3 in case of plants with a total rated thermal input greater than 300 MW.

A part of a combustion plant discharging its waste gases through one or more separate flues within a common stack, and which does not operate more than 1 500 operating hours per year as a rolling average over a period of 5 years, may be subject to the emission limit values set out in the preceding two paragraphs in relation to the total rated thermal input of the entire combustion plant. In such cases the emissions through each of those flues shall be monitored separately.

3.

Emission limit values (mg/Nm3) for SO2 for combustion plants using gaseous fuels with the exception of gas turbines and gas engines



In general

35

Liquefied gas

5

Low calorific gases from coke oven

400

Low calorific gases from blast furnace

200

Combustion plants, firing low calorific gases from gasification of refinery residues, which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003, shall be subject to an emission limit value for SO2 of 800 mg/Nm3.

4.

Emission limit values (mg/Nm3) for NOx for combustion plants using solid or liquid fuels with the exception of gas turbines and gas engines



Total rated thermal input (MW)

Coal and lignite and other solid fuels

Biomass and peat

Liquid fuels

50-100

300

450 in case of pulverised lignite combustion

300

450

100-300

200

250

200 (1)

> 300

200

200

150 (1)

(1)   

The emission limit value is 450 mg/Nm3 for the firing of distillation and conversion residues from the refining of crude-oil for own consumption in combustion plants with a total rated thermal input not exceeding 500 MW which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003.

Combustion plants in chemical installations using liquid production residues as non-commercial fuel for own consumption with a total rated thermal input not exceeding 500 MW which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003, shall be subject to an emission limit value for NOx of 450 mg/Nm3.

Combustion plants using solid or liquid fuels with a total rated thermal input not exceeding 500 MW which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003, and which do not operate more than 1 500 operating hours per year as a rolling average over a period of 5 years, shall be subject to an emission limit value for NOx of 450 mg/Nm3.

Combustion plants using solid fuels with a total rated thermal input greater than 500 MW, which were granted a permit before 1 July 1987 and which do not operate more than 1 500 operating hours per year as a rolling average over a period of 5 years, shall be subject to an emission limit value for NOx of 450 mg/Nm3.

Combustion plants using liquid fuels, with a total rated thermal input greater than 500 MW which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003, and which do not operate more than 1 500 operating hours per year as a rolling average over a period of 5 years, shall be subject to an emission limit value for NOx of 400 mg/Nm3.

A part of a combustion plant discharging its waste gases through one or more separate flues within a common stack, and which does not operate more than 1 500 operating hours per year as a rolling average over a period of 5 years, may be subject to the emission limit values set out in the preceding three paragraphs in relation to the total rated thermal input of the entire combustion plant. In such cases the emissions through each of those flues shall be monitored separately.

5.

Gas turbines (including combined cycle gas turbines (CCGT)) using light and middle distillates as liquid fuels shall be subject to an emission limit value for NOx of 90 mg/Nm3 and for CO of 100 mg/Nm3.

Gas turbines for emergency use that operate less than 500 operating hours per year are not covered by the emission limit values set out in this point. The operator of such plants shall record the used operating hours.

6.

Emission limit values (mg/Nm3) for NOx and CO for gas fired combustion plants



 

NOx

CO

Combustion plants firing natural gas with the exception of gas turbines and gas engines

100

100

Combustion plants firing blast furnace gas, coke oven gas or low calorific gases from gasification of refinery residues, with the exception of gas turbines and gas engines

200 (4)

—

Combustion plants firing other gases, with the exception of gas turbines and gas engines

200 (4)

—

Gas turbines (including CCGT), using natural gas (1) as fuel

50 (2) (3)

100

Gas turbines (including CCGT), using other gases as fuel

120

—

Gas engines

100

100

(1)   

Natural gas is naturally occurring methane with not more than 20 % (by volume) of inerts and other constituents.

(2)   

75 mg/Nm3 in the following cases, where the efficiency of the gas turbine is determined at ISO base load conditions:

(i)  gas turbines, used in combined heat and power systems having an overall efficiency greater than 75 %;

(ii)  gas turbines used in combined cycle plants having an annual average overall electrical efficiency greater than 55 %;

(iii)  gas turbines for mechanical drives.

(3)   

For single cycle gas turbines not falling into any of the categories mentioned under note (2), but having an efficiency greater than 35 % – determined at ISO base load conditions – the emission limit value for NOx shall be 50xη/35 where η is the gas turbine efficiency at ISO base load conditions expressed as a percentage.

(4)   

300 mg/Nm3 for such combustion plants with a total rated thermal input not exceeding 500 MW which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003.

For gas turbines (including CCGT), the NOx and CO emission limit values set out in the table contained in this point apply only above 70 % load.

For gas turbines (including CCGT) which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003, and which do not operate more than 1 500 operating hours per year as a rolling average over a period of 5 years, the emission limit value for NOx is 150 mg/Nm3 when firing natural gas and 200 mg/Nm3 when firing other gases or liquid fuels.

A part of a combustion plant discharging its waste gases through one or more separate flues within a common stack, and which does not operate more than 1 500 operating hours per year as a rolling average over a period of 5 years, may be subject to the emission limit values set out in the preceding paragraph in relation to the total rated thermal input of the entire combustion plant. In such cases the emissions through each of those flues shall be monitored separately.

Gas turbines and gas engines for emergency use that operate less than 500 operating hours per year are not covered by the emission limit values set out in this point. The operator of such plants shall record the used operating hours.

7.

Emission limit values (mg/Nm3) for dust for combustion plants using solid or liquid fuels with the exception of gas turbines and gas engines



Total rated thermal input (MW)

Coal and lignite and other solid fuels

Biomass and peat

Liquid fuels (1)

50-100

30

30

30

100-300

25

20

25

> 300

20

20

20

(1)   

The emission limit value is 50 mg/Nm3 for the firing of distillation and conversion residues from the refining of crude oil for own consumption in combustion plants which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003.

8.

Emission limit values (mg/Nm3) for dust for combustion plants using gaseous fuels with the exception of gas turbines and gas engines



In general

5

Blast furnace gas

10

Gases produced by the steel industry which can be used elsewhere

30

PART 2

Emission limit values for combustion plants referred to in Article 30(3)

1.

All emission limit values shall be calculated at a temperature of 273,15 K, a pressure of 101,3 kPa and after correction for the water vapour content of the waste gases and at a standardised O2 content of 6 % for solid fuels, 3 % for combustion plants other than gas turbines and gas engines using liquid and gaseous fuels and 15 % for gas turbines and gas engines.

In case of combined cycle gas turbines with supplementary firing, the standardised O2 content may be defined by the competent authority, taking into account the specific characteristics of the installation concerned.

2.

Emission limit values (mg/Nm3) for SO2 for combustion plants using solid or liquid fuels with the exception of gas turbines and gas engines



Total rated thermal input (MW)

Coal and lignite and other solid fuels

Biomass

Peat

Liquid fuels

50-100

400

200

300

350

100-300

200

200

300

250 in case of fluidised bed combustion

200

> 300

150

200 in case of circulating or pressurised fluidised bed combustion

150

150

200 in case of fluidised bed combustion

150

3.

Emission limit values (mg/Nm3) for SO2 for combustion plants using gaseous fuels with the exception of gas turbines and gas engines



In general

35

Liquefied gas

5

Low calorific gases from coke oven

400

Low calorific gases from blast furnace

200

4.

Emission limit values (mg/Nm3) for NOx for combustion plants using solid or liquid fuels with the exception of gas turbines and gas engines



Total rated thermal input (MW)

Coal and lignite and other solid fuels

Biomass and peat

Liquid fuels

50-100

300

400 in case of pulverised lignite combustion

250

300

100-300

200

200

150

> 300

150

200 in case of pulverised lignite combustion

150

100

5.

Gas turbines (including CCGT) using light and middle distillates as liquid fuels shall be subject to an emission limit value for NOx of 50 mg/Nm3 and for CO of 100 mg/Nm3

Gas turbines for emergency use that operate less than 500 operating hours per year are not covered by the emission limit values set out in this point. The operator of such plants shall record the used operating hours.

6.

Emission limit values (mg/Nm3) for NOx and CO for gas fired combustion plants



 

NOx

CO

Combustion plants other than gas turbines and gas engines

100

100

Gas turbines (including CCGT)

50 (1)

100

Gas engines

75

100

(1)   

For single cycle gas turbines having an efficiency greater than 35 % – determined at ISO base load conditions – the emission limit value for NOx shall be 50xη/35 where η is the gas turbine efficiency at ISO base load conditions expressed as a percentage.

For gas turbines (including CCGT), the NOx and CO emission limit values set out in this point apply only above 70 % load.

Gas turbines and gas engines for emergency use that operate less than 500 operating hours per year are not covered by the emission limit values set out in this point. The operator of such plants shall record the used operating hours.

7.

Emission limit values (mg/Nm3) for dust for combustion plants using solid or liquid fuels with the exception of gas turbines and gas engines



Total rated thermal input (MW)

 

50-300

20

> 300

10

20 for biomass and peat

8.

Emission limit values (mg/Nm3) for dust for combustion plants using gaseous fuels with the exception of gas turbines and gas engines



In general

5

Blast furnace gas

10

Gases produced by the steel industry which can be used elsewhere

30

PART 3

Emission monitoring

1.

The concentrations of SO2, NOx and dust in waste gases from each combustion plant with a total rated thermal input of 100 MW or more shall be measured continuously.

The concentration of CO in waste gases from each combustion plant firing gaseous fuels with a total rated thermal input of 100 MW or more shall be measured continuously.

2.

The competent authority may decide not to require the continuous measurements referred to in point 1 in the following cases:

(a) 

for combustion plants with a life span of less than 10 000 operational hours;

(b) 

for SO2 and dust from combustion plants firing natural gas;

(c) 

for SO2 from combustion plants firing oil with known sulphur content in cases where there is no waste gas desulphurisation equipment;

(d) 

for SO2 from combustion plants firing biomass if the operator can prove that the SO2 emissions can under no circumstances be higher than the prescribed emission limit values.

3.

Where continuous measurements are not required, measurements of SO2, NOx, dust and, for gas fired plants, also of CO shall be required at least once every 6 months.

4.

For combustion plants firing coal or lignite, the emissions of total mercury shall be measured at least once per year.

5.

As an alternative to the measurements of SO2 and NOx referred to in point 3, other procedures, verified and approved by the competent authority, may be used to determine the SO2 and NOx emissions. Such procedures shall use relevant CEN standards or, if CEN standards are not available, ISO, national or other international standards which ensure the provision of data of an equivalent scientific quality.

6.

The competent authority shall be informed of significant changes in the type of fuel used or in the mode of operation of the plant. The competent authority shall decide whether the monitoring requirements laid down in points 1 to 4 are still adequate or require adaptation.

7.

The continuous measurements carried out in accordance with point 1 shall include the measurement of the oxygen content, temperature, pressure and water vapour content of the waste gases. The continuous measurement of the water vapour content of the waste gases shall not be necessary, provided that the sampled waste gas is dried before the emissions are analysed.

8.

Sampling and analysis of relevant polluting substances and measurements of process parameters as well as the quality assurance of automated measuring systems and the reference measurement methods to calibrate those systems shall be carried out in accordance with CEN standards. If CEN standards are not available, ISO, national or other international standards which ensure the provision of data of an equivalent scientific quality shall apply.

The automated measuring systems shall be subject to control by means of parallel measurements with the reference methods at least once per year.

▼M1

The operator shall inform the competent authority about the results of the checking of the automated measuring systems without undue delay.

▼B

9.

At the emission limit value level, the values of the 95 % confidence intervals of a single measured result shall not exceed the following percentages of the emission limit values:



Carbon monoxide

10 %

Sulphur dioxide

20 %

Nitrogen oxides

20 %

Dust

30 %

10.

The validated hourly and daily average values shall be determined from the measured valid hourly average values after having subtracted the value of the confidence interval specified in point 9.

▼M1

Any day in which more than three hourly average values are invalid due to a malfunction or the maintenance of the automated measuring system shall be invalidated. If more than 10 days in a year are invalidated for such situations, the competent authority shall require the operator to take adequate measures to improve the reliability of the automated measuring system without undue delay.

▼B

11.

In the case of plants which must comply with the rates of desulphurisation referred to in Article 31, the sulphur content of the fuel which is fired in the combustion plant shall also be regularly monitored. The competent authorities shall be informed of substantial changes in the type of fuel used.

PART 4

Assessment of compliance with emission limit values

1.

In the case of continuous measurements, the emission limit values set out in Parts 1 and 2 shall be regarded as having been complied with if the evaluation of the measurement results indicates, for operating hours within a calendar year, that all of the following conditions have been met:

(a) 

no validated monthly average value exceeds the relevant emission limit values set out in Parts 1 and 2;

(b) 

no validated daily average value exceeds 110 % of the relevant emission limit values set out in Parts 1 and 2;

(c) 

in cases of combustion plants composed only of boilers using coal with a total rated thermal input below 50 MW, no validated daily average value exceeds 150 % of the relevant emission limit values set out in Parts 1 and 2,

(d) 

95 % of all the validated hourly average values over the year do not exceed 200 % of the relevant emission limit values set out in Parts 1 and 2.

The validated average values are determined as set out in point 10 of Part 3.

For the purpose of the calculation of the average emission values, the values measured during the periods referred to in Article 30(5) and (6) and Article 37 as well as during the start-up and shut-down periods shall be disregarded.

2.

Where continuous measurements are not required, the emission limit values set out in Parts 1 and 2 shall be regarded as having been complied with if the results of each of the series of measurements or of the other procedures defined and determined according to the rules laid down by the competent authorities do not exceed the emission limit values.

PART 5

Minimum rate of desulphurisation

1.

Minimum rate of desulphurisation for combustion plants referred to in Article 30(2)



Total rated thermal input (MW)

Minimum rate of desulphurisation

Plants which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003

Other plants

50-100

80 %

92 %

100-300

90 %

92 %

> 300

96 % (1)

96 %

(1)   

For combustion plants firing oil shale, the minimum rate of desulphurisation is 95 %.

2.

Minimum rate of desulphurisation for combustion plants referred to in Article 30(3)



Total rated thermal input (MW)

Minimum rate of desulphurisation

50-100

93 %

100-300

93 %

> 300

97 %

PART 6

Compliance with rate of desulphurisation

The minimum rates of desulphurisation set out in Part 5 of this Annex shall apply as a monthly average limit value.

PART 7

Average emission limit values for multi-fuel firing combustion plants within a refinery

Average emission limit values (mg/Nm3) for SO2 for multi-fuel firing combustion plants within a refinery, with the exception of gas turbines and gas engines, which use the distillation and conversion residues from the refining of crude-oil for own consumption, alone or with other fuels:

(a) 

for combustion plants which were granted a permit before 27 November 2002 or the operators of which had submitted a complete application for a permit before that date, provided that the plant was put into operation no later than 27 November 2003: 1 000  mg/Nm3;

(b) 

for other combustion plants: 600 mg/Nm3.

These emission limit values shall be calculated at a temperature of 273,15 K, a pressure of 101,3 kPa and after correction for the water vapour content of the waste gases and at a standardised O2 content of 6 % for solid fuels and 3 % for liquid and gaseous fuels.

ANNEX VI Technical provisions relating to waste incineration plants and waste co-incineration plants




ANNEX VI

Technical provisions relating to waste incineration plants and waste co-incineration plants

PART 1

Definitions

For the purpose of this Annex the following definitions shall apply:

(a) 

‘existing waste incineration plant’ means one of the following waste incineration plants:

(i) 

which was in operation and had a permit in accordance with applicable Union law before 28 December 2002,

(ii) 

which was authorised or registered for waste incineration and had a permit granted before 28 December 2002 in accordance with applicable Union law, provided that the plant was put into operation no later than 28 December 2003,

(iii) 

which, in the view of the competent authority, was the subject of a full request for authorisation before 28 December 2002, provided that the plant was put into operation not later than 28 December 2004;

(b) 

‘new waste incineration plant’ means any waste incineration plant not covered by point (a).

PART 2

Equivalence factors for dibenzo-p-dioxins and dibenzofurans

For the determination of the total concentration of dioxins and furans, the mass concentrations of the following dibenzo-p-dioxins and dibenzofurans shall be multiplied by the following equivalence factors before summing:



 

Toxic equivalence factor

2,3,7,8 — Tetrachlorodibenzodioxin (TCDD)

1

1,2,3,7,8 — Pentachlorodibenzodioxin (PeCDD)

0,5

1,2,3,4,7,8 — Hexachlorodibenzodioxin (HxCDD)

0,1

1,2,3,6,7,8 — Hexachlorodibenzodioxin (HxCDD)

0,1

1,2,3,7,8,9 — Hexachlorodibenzodioxin (HxCDD)

0,1

1,2,3,4,6,7,8 — Heptachlorodibenzodioxin (HpCDD)

0,01

Octachlorodibenzodioxin (OCDD)

0,001

2,3,7,8 — Tetrachlorodibenzofuran (TCDF)

0,1

2,3,4,7,8 — Pentachlorodibenzofuran (PeCDF)

0,5

1,2,3,7,8 — Pentachlorodibenzofuran (PeCDF)

0,05

1,2,3,4,7,8 — Hexachlorodibenzofuran (HxCDF)

0,1

1,2,3,6,7,8 — Hexachlorodibenzofuran (HxCDF)

0,1

1,2,3,7,8,9 — Hexachlorodibenzofuran (HxCDF)

0,1

2,3,4,6,7,8 — Hexachlorodibenzofuran (HxCDF)

0,1

1,2,3,4,6,7,8 — Heptachlorodibenzofuran (HpCDF)

0,01

1,2,3,4,7,8,9 — Heptachlorodibenzofuran (HpCDF)

0,01

Octachlorodibenzofuran (OCDF)

0,001

PART 3

Air emission limit values for waste incineration plants

1.

All emission limit values shall be calculated at a temperature of 273,15 K, a pressure of 101,3 kPa and after correcting for the water vapour content of the waste gases.

They are standardised at 11 % oxygen in waste gas except in case of incineration of mineral waste oil as defined in point 3 of Article 3 of Directive 2008/98/EC, when they are standardised at 3 % oxygen, and in the cases referred to in Point 2.7 of Part 6.

1.1.

Daily average emission limit values for the following polluting substances (mg/Nm3)



Total dust

10

Gaseous and vaporous organic substances, expressed as total organic carbon (TOC)

10

Hydrogen chloride (HCl)

10

Hydrogen fluoride (HF)

1

Sulphur dioxide (SO2)

50

Nitrogen monoxide (NO) and nitrogen dioxide (NO2), expressed as NO2 for existing waste incineration plants with a nominal capacity exceeding 6 tonnes per hour or new waste incineration plants

200

Nitrogen monoxide (NO) and nitrogen dioxide (NO2), expressed as NO2 for existing waste incineration plants with a nominal capacity of 6 tonnes per hour or less

400

1.2.

Half-hourly average emission limit values for the following polluting substances (mg/Nm3)



 

(100 %) A

(97 %) B

Total dust

30

10

Gaseous and vaporous organic substances, expressed as total organic carbon (TOC)

20

10

Hydrogen chloride (HCl)

60

10

Hydrogen fluoride (HF)

4

2

Sulphur dioxide (SO2)

200

50

Nitrogen monoxide (NO) and nitrogen dioxide (NO2), expressed as NO2 for existing waste incineration plants with a nominal capacity exceeding 6 tonnes per hour or new waste incineration plants

400

200

1.3.

Average emission limit values (mg/Nm3) for the following heavy metals over a sampling period of a minimum of 30 minutes and a maximum of 8 hours



Cadmium and its compounds, expressed as cadmium (Cd)

Total: 0,05

Thallium and its compounds, expressed as thallium (Tl)

Mercury and its compounds, expressed as mercury (Hg)

0,05

Antimony and its compounds, expressed as antimony (Sb)

Total: 0,5

Arsenic and its compounds, expressed as arsenic (As)

Lead and its compounds, expressed as lead (Pb)

Chromium and its compounds, expressed as chromium (Cr)

Cobalt and its compounds, expressed as cobalt (Co)

Copper and its compounds, expressed as copper (Cu)

Manganese and its compounds, expressed as manganese (Mn)

Nickel and its compounds, expressed as nickel (Ni)

Vanadium and its compounds, expressed as vanadium (V)

These average values cover also the gaseous and the vapour forms of the relevant heavy metal emissions as well as their compounds.

1.4.

Average emission limit value (ng/Nm3) for dioxins and furans over a sampling period of a minimum of 6 hours and a maximum of 8 hours. The emission limit value refers to the total concentration of dioxins and furans calculated in accordance with Part 2.



Dioxins and furans

0,1

1.5.

Emission limit values (mg/Nm3) for carbon monoxide (CO) in the waste gases:

(a) 

50 as daily average value;

(b) 

100 as half-hourly average value;

(c) 

150 as 10-minute average value.

The competent authority may authorise exemptions from the emission limit values set out in this point for waste incineration plants using fluidised bed technology, provided that the permit sets an emission limit value for carbon monoxide (CO) of not more than 100 mg/Nm3 as an hourly average value.

2.

Emission limit values applicable in the circumstances described in Article 46(6) and Article 47.

The total dust concentration in the emissions into the air of a waste incineration plant shall under no circumstances exceed 150 mg/Nm3 expressed as a half-hourly average. The air emission limit values for TOC and CO set out in points 1.2 and 1.5(b) shall not be exceeded.

3.

Member States may lay down rules governing the exemptions provided for in this Part.

PART 4

Determination of air emission limit values for the co-incineration of waste

1.

The following formula (mixing rule) shall be applied whenever a specific total emission limit value ‘C’ has not been set out in a table in this Part.

The emission limit value for each relevant polluting substance and CO in the waste gas resulting from the co-incineration of waste shall be calculated as follows:

▼C1

image

▼B

Vwaste

:

waste gas volume resulting from the incineration of waste only determined from the waste with the lowest calorific value specified in the permit and standardised at the conditions given by this Directive.

If the resulting heat release from the incineration of hazardous waste amounts to less than 10 % of the total heat released in the plant, Vwaste must be calculated from a (notional) quantity of waste that, being incinerated, would equal 10 % heat release, the total heat release being fixed.

Cwaste

:

emission limit values for waste incineration plants set out in Part 3

Vproc

:

waste gas volume resulting from the plant process including the combustion of the authorised fuels normally used in the plant (wastes excluded) determined on the basis of oxygen contents at which the emissions must be standardised as set out in Union or national law. In the absence of legislation for this kind of plant, the real oxygen content in the waste gas without being thinned by addition of air unnecessary for the process must be used.

Cproc

:

emission limit values as set out in this Part for certain industrial activities or in case of the absence of such values, emission limit values of plants which comply with the national laws, regulations and administrative provisions for such plants while burning the normally authorised fuels (wastes excluded). In the absence of these measures the emission limit values set out in the permit are used. In the absence of such permit values the real mass concentrations are used.

C

:

total emission limit values at an oxygen content as set out in this Part for certain industrial activities and certain polluting substances or, in case of the absence of such values, total emission limit values replacing the emission limit values as set out in specific Annexes of this Directive. The total oxygen content to replace the oxygen content for the standardisation is calculated on the basis of the content above respecting the partial volumes.

All emission limit values shall be calculated at a temperature of 273,15 K, a pressure of 101,3 kPa and after correcting for the water vapour content of the waste gases.

Member States may lay down rules governing the exemptions provided for in this Part.

2.

Special provisions for cement kilns co-incinerating waste

2.1.

The emission limit values set out in points 2.2 and 2.3 apply as daily average values for total dust, HCl, HF, NOx, SO2 and TOC (for continuous measurements), as average values over the sampling period of a minimum of 30 minutes and a maximum of 8 hours for heavy metals and as average values over the sampling period of a minimum of 6 hours and a maximum of 8 hours for dioxins and furans.

All values are standardised at 10 % oxygen.

Half-hourly average values shall only be needed in view of calculating the daily average values.

2.2.

C – total emission limit values (mg/Nm3 except for dioxins and furans) for the following –polluting substances



Polluting substance

C

Total dust

30

HCl

10

HF

1

NOx

500 (1)

Cd + Tl

0,05

Hg

0,05

Sb + As + Pb + Cr + Co + Cu + Mn + Ni + V

0,5

Dioxins and furans (ng/Nm3)

0,1

(1)   

Until 1 January 2016, the competent authority may authorise exemptions from the limit value for NOx for Lepol kilns and long rotary kilns provided that the permit sets a total emission limit value for NOx of not more than 800 mg/Nm3.

2.3.

C – total emission limit values (mg/Nm3) for SO2 and TOC



Pollutant

C

SO2

50

TOC

10

The competent authority may grant derogations for emission limit values set out in this point in cases where TOC and SO2 do not result from the co-incineration of waste.

2.4.

C- total emission limit values for CO

The competent authority may set emission limit values for CO.

3.

Special provisions for combustion plants co-incinerating waste

3.1.

Cproc expressed as daily average values (mg/Nm3) valid until the date set out in Article 82(5)

For determining the total rated thermal input of the combustion plants, the aggregation rules as defined in Article 29 shall apply. Half-hourly average values shall only be needed in view of calculating the daily average values.

Cproc for solid fuels with the exception of biomass (O2 content 6 %):



Polluting substances

< 50 MWth

50-100 MWth

100 to 300 MWth

> 300 MWth

SO2

—

850

200

200

NOx

—

400

200

200

Dust

50

50

30

30

Cproc for biomass (O2 content 6 %):



Polluting substances

< 50 MWth

50 to 100 MWth

100 to 300 MWth

> 300 MWth

SO2

—

200

200

200

NOx

—

350

300

200

Dust

50

50

30

30

Cproc for liquid fuels (O2 content 3 %):



Polluting substances

< 50 MWth

50 to 100 MWth

100 to 300 MWth

> 300 MWth

SO2

—

850

400 to 200

(linear decrease from 100 to 300 MWth)

200

NOx

—

400

200

200

Dust

50

50

30

30

3.2.

Cproc expressed as daily average values (mg/Nm3) valid from the date set out in Article 82(6)

For determining the total rated thermal input of the combustion plants, the aggregation rules as defined in Article 29 shall apply. Half-hourly average values shall only be needed in view of calculating the daily average values.

3.2.1.

Cproc for combustion plants referred to in Article 30(2), with the exception of gas turbines and gas engines

Cproc for solid fuels with the exception of biomass (O2 content 6 %):



Polluting substance

< 50 MWth

50-100 MWth

100 to 300 MWth

> 300 MWth

SO2

—

400 for peat: 300

200

200

NOx

—

300

for pulverised lignite: 400

200

200

Dust

50

30

25

for peat: 20

20

Cproc for biomass (O2 content 6 %):



Polluting substance

< 50 MWth

50 to 100 MWth

100 to 300 MWth

> 300 MWth

SO2

—

200

200

200

NOx

—

300

250

200

Dust

50

30

20

20

Cproc for liquid fuels (O2 content 3 %):



Polluting substance

< 50 MWth

50 to 100 MWth

100 to 300 MWth

> 300 MWth

SO2

—

350

250

200

NOx

—

400

200

150

Dust

50

30

25

20

3.2.2.

Cproc for combustion plants referred to in Article 30(3), with the exception of gas turbines and gas engines

Cproc for solid fuels with the exception of biomass (O2 content 6 %):



Polluting substance

< 50 MWth

50-100 MWth

100 to 300 MWth

> 300 MWth

SO2

—

400

for peat: 300

200

for peat: 300, except in the case of fluidised bed combustion: 250

150

for circulating or pressurised fluidised bed combustion or, in case of peat firing, for all fluidised bed combustion: 200

NOx

—

300

for peat: 250

200

150

for pulverised lignite combustion: 200

Dust

50

20

20

10

for peat: 20

Cproc for biomass (O2 content 6 %):



Polluting substance

< 50 MWth

50 to 100 MWth

100 to 300 MWth

> 300 MWth

SO2

—

200

200

150

NOx

—

250

200

150

Dust

50

20

20

20

Cproc for liquid fuels (O2 content 3 %):



Polluting substance

< 50 MWth

50 to 100 MWth

100 to 300 MWth

> 300 MWth

SO2

—

350

200

150

NOx

—

300

150

100

Dust

50

20

20

10

3.3.

C — total emission limit values for heavy metals (mg/Nm3) expressed as average values over the sampling period of a minimum of 30 minutes and a maximum of 8 hours (O2 content 6 % for solid fuels and 3 % for liquid fuels)



Polluting substances

C

Cd + Tl

0,05

Hg

0,05

Sb + As + Pb + Cr + Co + Cu + Mn + Ni + V

0,5

3.4.

C — total emission limit value (ng/Nm3) for dioxins and furans expressed as average value measured over the sampling period of a minimum of 6 hours and a maximum of 8 hours (O2 content 6 % for solid fuels and 3 % for liquid fuels)



Polluting substance

C

Dioxins and furans

0,1

4.

Special provisions for waste co-incineration plants in industrial sectors not covered under Points 2 and 3 of this Part

4.1.

C — total emission limit value (ng/Nm3) for dioxins and furans expressed as average value measured over the sampling period of a minimum of 6 hours and a maximum of 8 hours:



Polluting substance

C

Dioxins and furans

0,1

4.2.

C – total emission limit values (mg/Nm3) for heavy metals expressed as average values over the sampling period of a minimum of 30 minutes and a maximum of 8 hours:



Polluting substances

C

Cd + Tl

0,05

Hg

0,05

PART 5

Emission limit values for discharges of waste water from the cleaning of waste gases



Polluting substances

Emission limit values for unfiltered samples (mg/l except for dioxins and furans)

1.  Total suspended solids as defined in Annex I of Directive 91/271/EEC

(95 %)

(100 %)

30

45

2.  Mercury and its compounds, expressed as mercury (Hg)

0,03

3.  Cadmium and its compounds, expressed as cadmium (Cd)

0,05

4.  Thallium and its compounds, expressed as thallium (Tl)

0,05

5.  Arsenic and its compounds, expressed as arsenic (As)

0,15

6.  Lead and its compounds, expressed as lead (Pb)

0,2

7.  Chromium and its compounds, expressed as chromium (Cr)

0,5

8.  Copper and its compounds, expressed as copper (Cu)

0,5

9.  Nickel and its compounds, expressed as nickel (Ni)

0,5

10.  Zinc and its compounds, expressed as zinc (Zn)

1,5

11.  Dioxins and furans

0,3 ng/l

PART 6

Monitoring of emissions

1.   Measurement techniques

1.1.

Measurements for the determination of concentrations of air and water polluting substances shall be carried out representatively.

▼M1

1.2.

Sampling and analysis of all polluting substances including dioxins and furans, as well as the quality assurance of automated measuring systems and the reference measurement methods to calibrate them, shall be carried out in accordance with CEN-standards. If CEN standards are not available, ISO, national or other international standards which ensure the provision of data of an equivalent scientific quality shall apply. This applies also to the quality assurance system of the laboratory performing the sampling and analysis. Automated measuring systems shall be subject to control by means of parallel measurements with the reference methods at least once per year.

▼B

1.3.

At the daily emission limit value level, the values of the 95 % confidence intervals of a single measured result shall not exceed the following percentages of the emission limit values:



Carbon monoxide:

10 %

Sulphur dioxide:

20 %

Nitrogen dioxide:

20 %

Total dust:

30 %

Total organic carbon:

30 %

Hydrogen chloride:

40 %

Hydrogen fluoride:

40 %.

Periodic measurements of the emissions into air and water shall be carried out in accordance with points 1.1 and 1.2.

2.   Measurements relating to air polluting substances

2.1.

The following measurements relating to air polluting substances shall be carried out:

(a) 

continuous measurements of the following substances: NOx, provided that emission limit values are set, CO, total dust, TOC, HCl, HF, SO2;

(b) 

continuous measurements of the following process operation parameters: temperature near the inner wall or at another representative point of the combustion chamber as authorised by the competent authority, concentration of oxygen, pressure, temperature and water vapour content of the waste gas;

(c) 

at least two measurements per year of heavy metals and dioxins and furans; one measurement at least every 3 months shall, however, be carried out for the first 12 months of operation.

2.2.

The residence time as well as the minimum temperature and the oxygen content of the waste gases shall be subject to appropriate verification, at least once when the waste incineration plant or waste co-incineration plant is brought into service and under the most unfavourable operating conditions anticipated.

2.3.

The continuous measurement of HF may be omitted if treatment stages for HCl are used which ensure that the emission limit value for HCl is not being exceeded. In that case the emissions of HF shall be subject to periodic measurements as laid down in point 2.1(c).

2.4.

The continuous measurement of the water vapour content shall not be required if the sampled waste gas is dried before the emissions are analysed.

2.5.

The competent authority may decide not to require continuous measurements for HCl, HF and SO2 in waste incineration plants or waste co-incineration plants and require periodic measurements as set out in point 2.1(c) or no measurements if the operator can prove that the emissions of those pollutants can under no circumstances be higher than the prescribed emission limit values.

The competent authority may decide not to require continuous measurements for NOx and require periodic measurements as set out in point 2.1(c) in existing waste incineration plants with a nominal capacity of less than 6 tonnes per hour or in existing waste co-incineration plants with a nominal capacity of less than 6 tonnes per hour if the operator can prove on the basis of information on the quality of the waste concerned, the technologies used and the results of the monitoring of emissions, that the emissions of NOx can under no circumstances be higher than the prescribed emission limit value.

2.6.

The competent authority may decide to require one measurement every 2 years for heavy metals and one measurement per year for dioxins and furans in the following cases:

(a) 

the emissions resulting from co-incineration or incineration of waste are under all circumstances below 50 % of the emission limit values;

(b) 

the waste to be co-incinerated or incinerated consists only of certain sorted combustible fractions of non-hazardous waste not suitable for recycling and presenting certain characteristics, and which is further specified on the basis of the assessment referred to in point (c);

(c) 

the operator can prove on the basis of information on the quality of the waste concerned and the monitoring of the emissions that the emissions are under all circumstances significantly below the emission limit values for heavy metals and dioxins and furans.

2.7.

The results of the measurements shall be standardised using the standard oxygen concentrations mentioned in Part 3 or calculated according to Part 4 and by applying the formula given in Part 7.

When waste is incinerated or co-incinerated in an oxygen-enriched atmosphere, the results of the measurements can be standardised at an oxygen content laid down by the competent authority reflecting the special circumstances of the individual case.

When the emissions of polluting substances are reduced by waste gas treatment in a waste incineration plant or waste co-incineration plant treating hazardous waste, the standardisation with respect to the oxygen contents provided for in the first subparagraph shall be done only if the oxygen content measured over the same period as for the polluting substance concerned exceeds the relevant standard oxygen content.

3.   Measurements relating to water polluting substances

3.1.

The following measurements shall be carried out at the point of waste water discharge:

(a) 

continuous measurements of pH, temperature and flow;

(b) 

spot sample daily measurements of total suspended solids or measurements of a flow proportional representative sample over a period of 24 hours;

(c) 

at least monthly measurements of a flow proportional representative sample of the discharge over a period of 24 hours of Hg, Cd, TI, As, Pb, Cr, Cu, Ni and Zn;

(d) 

at least every 6 months measurements of dioxins and furans; however, one measurement at least every 3 months shall be carried out for the first 12 months of operation.

3.2.

Where the waste water from the cleaning of waste gases is treated on site collectively with other on-site sources of waste water, the operator shall take the measurements:

(a) 

on the waste water stream from the waste gas cleaning processes prior to its input into the collective waste water treatment plant;

(b) 

on the other waste water stream or streams prior to its or their input into the collective waste water treatment plant;

(c) 

at the point of final waste water discharge, after the treatment, from the waste incineration plant or waste co-incineration plant.

PART 7

Formula to calculate the emission concentration at the standard percentage oxygen concentration

image

ES

=

calculated emission concentration at the standard percentage oxygen concentration

EM

=

measured emission concentration

OS

=

standard oxygen concentration

OM

=

measured oxygen concentration

PART 8

Assessment of compliance with emission limit values

1.   Air emission limit values

1.1.

The emission limit values for air shall be regarded as being complied with if:

(a) 

none of the daily average values exceeds any of the emission limit values set out in point 1.1 of Part 3 or in Part 4 or calculated in accordance with Part 4;

(b) 

either none of the half-hourly average values exceeds any of the emission limit values set out in column A of the table under point 1.2 of Part 3 or, where relevant, 97 % of the half-hourly average values over the year do not exceed any of the emission limit values set out in column B of the table under point 1.2 of Part 3;

(c) 

none of the average values over the sampling period set out for heavy metals and dioxins and furans exceeds the emission limit values set out in points 1.3 and 1.4 of Part 3 or in Part 4 or calculated in accordance with Part 4;

(d) 

for carbon monoxide (CO):

(i) 

in case of waste incineration plants:

— 
at least 97 % of the daily average values over the year do not exceed the emission limit value set out in point 1.5(a) of Part 3; and,
— 
at least 95 % of all 10-minute average values taken in any 24-hour period or all of the half-hourly average values taken in the same period do not exceed the emission limit values set out in points 1.5(b) and (c) of Part 3; in case of waste incineration plants in which the gas resulting from the incineration process is raised to a temperature of at least 1 100  °C for at least two seconds, Member States may apply an evaluation period of 7 days for the 10-minute average values;
(ii) 

in case of waste co-incineration plants: the provisions of Part 4 are met.

1.2.

The half-hourly average values and the 10-minute averages shall be determined within the effective operating time (excluding the start-up and shut-down periods if no waste is being incinerated) from the measured values after having subtracted the value of the confidence interval specified in point 1.3 of Part 6. The daily average values shall be determined from those validated average values.

To obtain a valid daily average value no more than five half-hourly average values in any day shall be discarded due to malfunction or maintenance of the continuous measurement system. No more than ten daily average values per year shall be discarded due to malfunction or maintenance of the continuous measurement system.

1.3.

The average values over the sampling period and the average values in the case of periodical measurements of HF, HCl and SO2 shall be determined in accordance with the requirements of Articles 45(1)(e), 48(3) and point 1 of Part 6.

2.   Water emission limit values

The emission limit values for water shall be regarded as being complied with if:

(a) 

for total suspended solids 95 % and 100 % of the measured values do not exceed the respective emission limit values as set out in Part 5;

(b) 

for heavy metals (Hg, Cd, TI, As, Pb, Cr, Cu, Ni and Zn) no more than one measurement per year exceeds the emission limit values set out in Part 5; or, if the Member State provides for more than 20 samples per year, no more than 5 % of these samples exceed the emission limit values set out in Part 5;

(c) 

for dioxins and furans, the measurement results do not exceed the emission limit value set out in Part 5.

ANNEX VII Technical provisions relating to installations and activities using organic solvents




ANNEX VII

Technical provisions relating to installations and activities using organic solvents

PART 1

Activities

1.

In each of the following points, the activity includes the cleaning of the equipment but not the cleaning of products unless specified otherwise.

2.

Adhesive coating

Any activity in which an adhesive is applied to a surface, with the exception of adhesive coating and laminating associated with printing activities.

3.

Coating activity

Any activity in which a single or multiple application of a continuous film of a coating is applied to:

(a) 

either of the following vehicles:

(i) 

new cars, defined as vehicles of category M1 in Directive 2007/46/EC of the European Parliament and of the Council of 5 September 2007 establishing a framework for the approval of motor vehicles and their trailers, and of systems, components and separate technical units intended for such vehicles ( 26 ) and of category N1 in so far as they are coated at the same installation as M1 vehicles;

(ii) 

truck cabins, defined as the housing for the driver, and all integrated housing for the technical equipment, of vehicles of categories N2 and N3 in Directive 2007/46/EC;

(iii) 

vans and trucks, defined as vehicles of categories N1, N2 and N3 in Directive 2007/46/EC, but not including truck cabins;

(iv) 

buses, defined as vehicles of categories M2 and M3 in Directive 2007/46/EC;

(v) 

trailers, defined in categories O1, O2, O3 and O4 in Directive 2007/46/EC;

(b) 

metallic and plastic surfaces including surfaces of airplanes, ships, trains, etc.;

(c) 

wooden surfaces;

(d) 

textile, fabric, film and paper surfaces;

(e) 

leather.

Coating activities do not include the coating of substrate with metals by electrophoretic and chemical spraying techniques. If the coating activity includes a step in which the same article is printed by whatever technique used, that printing step is considered part of the coating activity. However, printing activities operated as a separate activity are not included, but may be covered by Chapter V of this Directive if the printing activity falls within the scope thereof.

4.

Coil coating

Any activity where coiled steel, stainless steel, coated steel, copper alloys or aluminium strip is coated with either a film forming or laminate coating in a continuous process.

5.

Dry cleaning

Any industrial or commercial activity using volatile organic compounds in an installation to clean garments, furnishing and similar consumer goods with the exception of the manual removal of stains and spots in the textile and clothing industry.

6.

Footwear manufacture

Any activity of producing complete footwear or parts thereof.

7.

Manufacturing of coating mixtures, varnishes, inks and adhesives

The manufacture of the above final products, and of intermediates where carried out at the same site, by mixing of pigments, resins and adhesive materials with organic solvent or other carrier, including dispersion and predispersion activities, viscosity and tint adjustments and operations for filling the final product into its container.

8.

Manufacturing of pharmaceutical products

The chemical synthesis, fermentation, extraction, formulation and finishing of pharmaceutical products and, where carried out at the same site, the manufacture of intermediate products.

9.

Printing

Any reproduction activity of text and/or images in which, with the use of an image carrier, ink is transferred onto whatever type of surface. It includes associated varnishing, coating and laminating techniques. However, only the following sub-processes are subject to Chapter V:

(a) 

flexography – a printing activity using an image carrier of rubber or elastic photopolymers on which the printing areas are above the non-printing areas, using liquid inks which dry through evaporation;

(b) 

heatset web offset – a web-fed printing activity using an image carrier in which the printing and non-printing area are in the same plane, where web-fed means that the material to be printed is fed to the machine from a reel as distinct from separate sheets. The non-printing area is treated to attract water and thus reject ink. The printing area is treated to receive and transmit ink to the surface to be printed. Evaporation takes place in an oven where hot air is used to heat the printed material;

(c) 

laminating associated to a printing activity – the adhering together of two or more flexible materials to produce laminates;

(d) 

publication rotogravure – a rotogravure printing activity used for printing paper for magazines, brochures, catalogues or similar products, using toluene-based inks;

(e) 

rotogravure – a printing activity using a cylindrical image carrier in which the printing area is below the non-printing area, using liquid inks which dry through evaporation. The recesses are filled with ink and the surplus is cleaned off the non-printing area before the surface to be printed contacts the cylinder and lifts the ink from the recesses;

(f) 

rotary screen printing – a web-fed printing activity in which the ink is passed onto the surface to be printed by forcing it through a porous image carrier, in which the printing area is open and the non-printing area is sealed off, using liquid inks which dry only through evaporation. Web-fed means that the material to be printed is fed into the machine from a reel as distinct from separate sheets;

(g) 

varnishing – an activity by which a varnish or an adhesive coating for the purpose of later sealing the packaging material is applied to a flexible material.

10.

Rubber conversion

Any activity of mixing, milling, blending, calendering, extrusion and vulcanisation of natural or synthetic rubber and any ancillary operations for converting natural or synthetic rubber into a finished product.

11.

Surface cleaning

Any activity except dry cleaning using organic solvents to remove contamination from the surface of material including degreasing. A cleaning activity consisting of more than one step before or after any other activity shall be considered as one surface cleaning activity. This activity does not refer to the cleaning of the equipment but to the cleaning of the surface of products.

12.

Vegetable oil and animal fat extraction and vegetable oil refining activities

Any activity to extract vegetable oil from seeds and other vegetable matter, the processing of dry residues to produce animal feed, the purification of fats and vegetable oils derived from seeds, vegetable matter and/or animal matter.

13.

Vehicle refinishing

Any industrial or commercial coating activity and associated degreasing activities performing either of the following:

(a) 

the original coating of road vehicles as defined in Directive 2007/46/EC or part of them with refinishing-type materials, where this is carried out away from the original manufacturing line;

(b) 

the coating of trailers (including semi-trailers) (category O in Directive 2007/46/EC).

14.

Winding wire coating

Any coating activity of metallic conductors used for winding the coils in transformers and motors, etc.

15.

Wood impregnation

Any activity giving a loading of preservative in timber.

16.

Wood and plastic lamination

Any activity to adhere together wood and/or plastic to produce laminated products.

PART 2

Thresholds and emission limit values

The emission limit values in waste gases shall be calculated at a temperature of 273,15 K, and a pressure of 101,3 kPa.



 

Activity

(solvent consumption threshold in tonnes/year)

Threshold

(solvent consumption threshold in tonnes/year)

Emission limit values in waste gases (mg C/Nm3)

Fugitive emission limit values (percentage of solvent input)

Total emission limit values

Special provisions

New installations

Existing installations

New installations

Existing installations

1

Heatset web offset printing

(> 15)

15—25

> 25

100

20

30 (1)

30 (1)

 

(1) Solvent residue in finished product is not to be considered as part of fugitive emissions.

2

Publication rotogravure

(> 25)

 

75

10

15

 

 

 

3

Other rotogravure, flexography, rotary screen printing, laminating or varnishing units (> 15) rotary screen printing on textile/cardboard (> 30)

15—25

> 25

> 30 (1)

100

100

100

25

20

20

 

(1) Threshold for rotary screen printing on textile and on cardboard.

4

Surface cleaning using compounds specified in Article 59(5).

(> 1)

1—5

> 5

20 (1)

20 (1)

15

10

 

(1) Limit value refers to mass of compounds in mg/Nm3, and not to total carbon.

5

Other surface cleaning

(> 2)

2—10

> 10

75 (1)

75 (1)

20 (1)

15 (1)

 

(1) Installations which demonstrate to the competent authority that the average organic solvent content of all cleaning material used does not exceed 30 % by weight are exempt from application of these values.

6

Vehicle coating (< 15) and vehicle refinishing

> 0,5

50 (1)

25

 

(1) Compliance in accordance with point 2 of Part 8 shall be demonstrated based on 15 minute average measurements.

7

Coil coating

(> 25)

 

50 (1)

5

10

 

(1) For installations which use techniques which allow reuse of recovered solvents, the emission limit value shall be 150.

8

Other coating, including metal, plastic, textile (5), fabric, film and paper coating

(> 5)

5—15

> 15

100 (1) (4)

50/75 (2) (3) (4)

25 (4)

20 (4)

 

 

(1) Emission limit value applies to coating application and drying processes operated under contained conditions.

(2) The first emission limit value applies to drying processes, the second to coating application processes.

 

 

 

 

 

 

(3) For textile coating installations which use techniques which allow reuse of recovered solvents, the emission limit value applied to coating application and drying processes taken together shall be 150.

(4) Coating activities which cannot be carried out under contained conditions (such as shipbuilding, aircraft painting) may be exempted from these values, in accordance with Article 59(3).

(5) Rotary screen printing on textile is covered by activity No 3.

9

Winding wire coating

(> 5)

 

 

 

10 g/kg (1)

5 g/kg (2)

(1) Applies for installations where average diameter of wire ≤ 0,1 mm.

(2) Applies for all other installations.

10

Coating of wooden surfaces

(> 15)

15—25

> 25

100 (1)

50/75 (2)

25

20

 

(1) Emission limit value applies to coating application and drying processes operated under contained conditions.

(2) The first value applies to drying processes, the second to coating application processes.

11

Dry cleaning

 

 

 

20 g/kg (1) (2)

(1) Expressed in mass of solvent emitted per kilogram of product cleaned and dried.

(2) The emission limit value in point 2 of Part 4 does not apply for this activity.

12

Wood impregnation

(> 25)

 

100 (1)

45

11 kg/m3

(1) Emission limit value does not apply for impregnation with creosote.

13

Coating of leather

(> 10)

10—25

> 25

> 10 (1)

 

 

85 g/m2

75 g/m2

150 g/m2

Emission limit values are expressed in grams of solvent emitted per m2 of product produced.

(1) For leather coating activities in furnishing and particular leather goods used as small consumer goods like bags, belts, wallets, etc.

14

Footwear manufacture

(> 5)

 

 

 

25 g per pair

Total emission limit value is expressed in grams of solvent emitted per pair of complete footwear produced.

15

Wood and plastic lamination

(> 5)

 

 

 

30 g/m2

 

16

Adhesive coating

(> 5)

5—15

> 15

50 (1)

50 (1)

25

20

 

(1) If techniques are used which allow reuse of recovered solvent, the emission limit value in waste gases shall be 150.

17

Manufacture of coating mixture, varnishes, inks and adhesives

(> 100)

100—1 000

> 1 000

150

150

5

3

5 % of solvent input

3 % of solvent input

The fugitive emission limit value does not include solvent sold as part of a coatings mixture in a sealed container.

18

Rubber conversion

(> 15)

 

20 (1)

25 (2)

25 % of solvent input

(1) If techniques are used which allow reuse of recovered solvent, the emission limit value in waste gases shall be 150.

(2) The fugitive emission limit value does not include solvent sold as part of products or mixtures in a sealed container.

19

Vegetable oil and animal fat extraction and vegetable oil refining activities

(> 10)

 

 

 

Animal fat: 1,5 kg/tonne

Castor: 3 kg/tonne

Rape seed: 1 kg/tonne

Sunflower seed: 1 kg/tonne

Soya beans (normal crush): 0,8 kg/tonne

Soya beans (white flakes): 1,2 kg/tonne

Other seeds and other vegetable matter: 3 kg/tonne (1) 1,5 kg/tonne (2) 4 kg/tonne (3)

(1) Total emission limit values for installations processing individual batches of seeds and other vegetable matter should be set by the competent authority on a case-by-case basis, applying the best available techniques.

(2) Applies to all fractionation processes excluding de-gumming (the removal of gums from the oil).

(3) Applies to de-gumming.

20

Manufacturing of pharmaceutical products

(> 50)

 

20 (1)

5 (2)

15 (2)

5 % of solvent input

15 % of solvent input

(1) If techniques are used which allow reuse of recovered solvent, the emission limit value in waste gases shall be 150.

(2) The fugitive emission limit value does not include solvent sold as part of products or mixtures in a sealed container.

PART 3

Emission limit values for installations of the vehicle coating industry

1.

The total emission limit values are expressed in terms of grams of organic solvent emitted in relation to the surface area of product in square metres and in kilograms of organic solvent emitted in relation to the car body.

2.

The surface area of any product dealt with in the table under point 3 is defined as the surface area calculated from the total electrophoretic coating area, and the surface area of any parts that might be added in successive phases of the coating process which are coated with the same coatings as those used for the product in question, or the total surface area of the product coated in the installation.

The surface of the electrophoretic coating area is calculated using the following formula:

image

This method shall also be applied for other coated parts made out of sheets.

Computer aided design or other equivalent methods shall be used to calculate the surface area of the other parts added, or the total surface area coated in the installation.

3.

The total emission limit values in the table below refer to all process stages carried out at the same installation from electrophoretic coating, or any other kind of coating process, through to the final wax and polish of topcoating inclusive, as well as solvent used in cleaning of process equipment, including spray booths and other fixed equipment, both during and outside of production time.



Activity

(solvent consumption threshold in tonnes/year)

Production threshold

(refers to annual production of coated item)

Total emission limit value

New installations

Existing installations

Coating of new cars (> 15)

> 5 000

45 g/m2 or 1,3 kg/body + 33 g/m2

60 g/m2 or 1,9 kg/body + 41 g/m2

≤ 5 000 monocoque or > 3 500 chassis-built

90 g/m2 or 1,5 kg/body + 70 g/m2

90 g/m2 or 1,5 kg/body + 70 g/m2

 

 

Total emission limit value (g/m2)

Coating of new truck cabins (> 15)

≤ 5 000

65

85

> 5 000

55

75

Coating of new vans and trucks (> 15)

≤ 2 500

90

120

> 2 500

70

90

Coating of new buses (> 15)

≤ 2 000

210

290

> 2 000

150

225

4.

Vehicle coating installations below the solvent consumption thresholds mentioned in the table under point 3 shall meet the requirements for the vehicle refinishing sector set out in Part 2.

PART 4

Emission limit values relating to volatile organic compounds with specific risk phrases

1.

For emissions of the volatile organic compounds referred to in Article 58 where the mass flow of the sum of the compounds causing the labelling referred to in that Article is greater than, or equal to, 10 g/h, an emission limit value of 2 mg/Nm3 shall be complied with. The emission limit value refers to the mass sum of the individual compounds.

2.

For emissions of halogenated volatile organic compounds which are assigned or need to carry the hazard statements H341 or H351, where the mass flow of the sum of the compounds causing the hazard statements H341 or H351 is greater than, or equal to, 100 g/h, an emission limit value of 20 mg/Nm3 shall be complied with. The emission limit value refers to the mass sum of the individual compounds.

PART 5

Reduction scheme

1.

The operator may use any reduction scheme, specially designed for his installation.

2.

In the case of applying coatings, varnishes, adhesives or inks, the following scheme can be used. Where the following method is inappropriate, the competent authority may allow an operator to apply any alternative scheme achieving equivalent emission reductions to those achieved if the emission limit values of Parts 2 and 3 were to be applied. The design of the scheme shall take into account the following facts:

(a) 

where substitutes containing little or no solvent are still under development, a time extension shall be given to the operator to implement his emission reduction plans;

(b) 

the reference point for emission reductions should correspond as closely as possible to the emissions which would have resulted had no reduction action been taken.

3.

The following scheme shall operate for installations for which a constant solid content of product can be assumed:

(a) 

The annual reference emission is calculated as follows:

(i) 

The total mass of solids in the quantity of coating and/or ink, varnish or adhesive consumed in a year is determined. Solids are all materials in coatings, inks, varnishes and adhesives that become solid once the water or the volatile organic compounds are evaporated.

(ii) 

The annual reference emissions are calculated by multiplying the mass determined in (i) by the appropriate factor listed in the table below. Competent authorities may adjust these factors for individual installations to reflect documented increased efficiency in the use of solids.



Activity

Multiplication factor for use in item (a)(ii)

Rotogravure printing; flexography printing; laminating as part of a printing activity; varnishing as part of a printing activity; wood coating; coating of textiles, fabric film or paper; adhesive coating

4

Coil coating, vehicle refinishing

3

Food contact coating, aerospace coatings

2,33

Other coatings and rotary screen printing

1,5

(b) 

The target emission is equal to the annual reference emission multiplied by a percentage equal to:

(i) 

(the fugitive emission limit value + 15), for installations falling within item 6 and the lower threshold band of items 8 and 10 of Part 2,

(ii) 

(the fugitive emission limit value + 5) for all other installations.

(c) 

Compliance is achieved if the actual solvent emission determined from the solvent management plan is less than or equal to the target emission.

PART 6

Emission monitoring

1.

Channels to which abatement equipment is connected, and which at the final point of discharge emit more than an average of 10 kg/h of total organic carbon, shall be monitored continuously for compliance.

2.

In the other cases, Member States shall ensure that either continuous or periodic measurements are carried out. For periodic measurements at least three measurement values shall be obtained during each measurement exercise.

3.

Measurements are not required in the case where end-of-pipe abatement equipment is not needed to comply with this Directive.

PART 7

Solvent management plan

1.   Principles

The solvent management plan shall be used to:

(a) 

verify compliance as specified in Article 62;

(b) 

identify future reduction options;

(c) 

enable provision of information on solvent consumption, solvent emissions and compliance with the requirements of Chapter V to the public.

2.   Definitions

The following definitions provide a framework for the mass balance exercise.

Inputs of organic solvents (I):

I1

The quantity of organic solvents or their quantity in mixtures purchased which are used as input into the process in the time frame over which the mass balance is being calculated.

I2

The quantity of organic solvents or their quantity in mixtures recovered and reused as solvent input into the process. The recycled solvent is counted every time it is used to carry out the activity.

Outputs of organic solvents (O):

O1

Emissions in waste gases.

O2

Organic solvents lost in water, taking into account waste water treatment when calculating O5.

O3

The quantity of organic solvents which remains as contamination or residue in products output from the process.

O4

Uncaptured emissions of organic solvents into air. This includes the general ventilation of rooms, where air is released to the outside environment via windows, doors, vents and similar openings.

O5

Organic solvents and/or organic compounds lost due to chemical or physical reactions (including those which are destroyed, by incineration or other waste gas or waste water treatments, or captured, as long as they are not counted under O6, O7 or O8).

O6

Organic solvents contained in collected waste.

O7

Organic solvents, or organic solvents contained in mixtures, which are sold or are intended to be sold as a commercially valuable product.

O8

Organic solvents contained in mixtures recovered for reuse but not as input into the process, as long as not counted under O7.

O9

Organic solvents released in other ways.

3.

Use of the solvent management plan for verification of compliance.

The use made of the solvent management plan shall be determined by the particular requirement which is to be verified, as follows:

(a) 

verification of compliance with the reduction scheme as set out in Part 5, with a total emission limit value expressed in solvent emissions per unit product, or otherwise stated in Parts 2 and 3.

(i) 

for all activities using the reduction scheme as set out in Part 5, the solvent management plan shall be drawn up annually to determine the consumption (C). The consumption shall be calculated according to the following equation:

C = I1 – O8

A parallel exercise shall also be undertaken to determine solids used in coating in order to derive the annual reference emission and the target emission each year.

(ii) 

for assessing compliance with a total emission limit value expressed in solvent emissions per unit product or otherwise stated in Parts 2 and 3, the solvent management plan shall be drawn up annually to determine the emissions (E). The emissions shall be calculated according to the following equation:

E = F + O1

Where F is the fugitive emission as defined in point (b)(i). The emission figure shall then be divided by the relevant product parameter.

(iii) 

for assessing compliance with the requirements of point (b)(ii) of Article 59(6), the solvent management plan shall be drawn up annually to determine total emissions from all activities concerned, and that figure shall then be compared with the total emissions that would have resulted had the requirements of Parts 2, 3 and 5 been met for each activity separately.

(b) 

Determination of fugitive emissions for comparison with the fugitive emission limit values in Part 2:

(i) 

The fugitive emission shall be calculated according to one of the following equations;

F = I1 – O1 – O5 – O6 – O7 – O8

or

F = O2 + O3 + O4 + O9

F shall be determined either by direct measurement of the quantities or by an equivalent method or calculation, for instance by using the capture efficiency of the process.

The fugitive emission limit value is expressed as a proportion of the input, which shall be calculated according to the following equation:

I = I1 + I2

(ii) 

Determination of fugitive emissions shall be done by a short but comprehensive set of measurements and needs not be done again until the equipment is modified.

PART 8

Assessment of compliance with emission limit values in waste gases

1.

In the case of continuous measurements the emission limit values shall be considered to be complied with if:

(a) 

none of the arithmetic averages of all valid readings taken during any 24-hour period of operation of an installation or activity except start-up and shut-down operations and maintenance of equipment exceeds the emission limit values,

(b) 

none of the hourly averages exceeds the emission limit values by more than a factor of 1,5.

2.

In the case of periodic measurements the emission limit values shall be considered to be complied with if, in one monitoring exercise:

(a) 

the average of all the measurement values does not exceed the emission limit values,

(b) 

none of the hourly averages exceeds the emission limit value by more than a factor of 1,5.

3.

Compliance with Part 4 shall be verified on the basis of the sum of the mass concentrations of the individual volatile organic compounds concerned. For all other cases, compliance shall be verified on the basis of the total mass of organic carbon emitted unless otherwise specified in Part 2.

4.

Gas volumes may be added to the waste gas for cooling or dilution purposes where technically justified but shall not be considered when determining the mass concentration of the pollutant in the waste gas.

ANNEX VIII Technical provisions relating to installations producing titanium dioxide




ANNEX VIII

Technical provisions relating to installations producing titanium dioxide

PART 1

Emission limit values for emissions into water

1.

In case of installations using the sulphate process (as an annual average):

550 kg of sulphate per tonne of titanium dioxide produced.

2.

In case of installations using the chloride process (as an annual average):

(a) 

130 kg chloride per tonne of titanium dioxide produced using neutral rutile,

(b) 

228 kg chloride per tonne of titanium dioxide produced using synthetic rutile,

(c) 

330 kg chloride per tonne of titanium dioxide produced using slag. Installations discharging into salt water (estuarine, coastal, open sea) may be subject to an emission limit value of 450 kg chloride per tonne of titanium dioxide produced using slag.

3.

For installations using the chloride process and using more than one type of ore, the emission limit values in point 2 shall apply in proportion to the quantity of the ores used.

PART 2

Emission limit values into air

1.

The emission limit values which are expressed as concentrations in mass per cubic meter (Nm3) shall be calculated at a temperature of 273,15 K, and a pressure of 101,3 kPa.

2.

For dust: 50 mg/Nm3 as an hourly average from major sources and 150 mg/Nm3 as an hourly average from any other source.

3.

For gaseous sulphur dioxide and trioxide discharged from digestion and calcination, including acid droplets calculated as SO2 equivalent:

(a) 

6 kg per tonne of titanium dioxide produced as an annual average;

(b) 

500 mg/Nm3 as an hourly average for plants for the concentration of waste acid.

4.

For chlorine in the case of installations using the chloride process:

(a) 

5 mg/Nm3 as a daily average;

(b) 

40 mg/Nm3 at any time.

PART 3

Emission monitoring

The monitoring of emissions into air shall include at least the continuous monitoring of:

(a) 

gaseous sulphur dioxide and trioxide discharged from digestion and calcination from plants for the concentration of waste acid in installations using the sulphate process;

(b) 

chlorine from major sources within installations using the chloride process;

(c) 

dust from major sources.

ANNEX IX




ANNEX IX

PART A



Repealed Directives with their successive amendments

(referred to in Article 81)

Council Directive 78/176/EEC

(OJ L 54, 25.2.1978, p. 19).

 

Council Directive 83/29/EEC

(OJ L 32, 3.2.1983, p. 28).

 

Council Directive 91/692/EEC

(OJ L 377, 31.12.1991, p. 48).

only Annex I, point (b)

Council Directive 82/883/EEC

(OJ L 378, 31.12.1982, p. 1).

 

Act of Accession of 1985

only Annex I, point X.1(o)

Act of Accession of 1994

only Annex I, point VIII.A.6

Council Regulation (EC) No 807/2003

(OJ L 122, 16.5.2003, p. 36).

only Annex III, point 34

Regulation (EC) No 219/2009 of the European Parliament and of the Council

(OJ L 87, 31.3.2009, p. 109).

only Annex, point 3.1

Council Directive 92/112/EEC

(OJ L 409, 31.12.1992, p. 11).

 

Council Directive 1999/13/EC

(OJ L 85, 29.3.1999, p. 1).

 

Regulation (EC) No 1882/2003 of the European Parliament and of the Council

(OJ L 284, 31.10.2003, p. 1).

only Annex I, point 17

Directive 2004/42/EC of the European Parliament and of the Council

(OJ L 143, 30.4.2004, p. 87).

only Article 13(1)

Directive 2008/112/EC of the European Parliament and of the Council

(OJ L 345, 23.12.2008, p. 68).

only Article 3

Directive 2000/76/EC of the European Parliament and of the Council

(OJ L 332, 28.12.2000, p. 91).

 

Regulation (EC) No 1137/2008 of the European Parliament and of the Council

(OJ L 311, 21.11.2008, p. 1).

only Annex, point 4.8

Directive 2001/80/EC of the European Parliament and of the Council

(OJ L 309, 27.11.2001, p. 1).

 

Council Directive 2006/105/EC

(OJ L 363, 20.12.2006, p. 368).

only Annex, part B, point 2

Directive 2009/31/EC of the European Parliament and of the Council

(OJ L 140, 5.6.2009, p. 114).

only Article 33

Directive 2008/1/EC of the European Parliament and of the Council

(OJ L 24, 29.1.2008, p. 8).

 

Directive 2009/31/EC of the European Parliament and of the Council

(OJ L 140, 5.6.2009, p. 114).

only Article 37

PART B



List of time-limits for transposition into national law and application

(referred to in Article 81)

Directive

Time-limit for transposition

Time-limit for application

78/176/EEC

25 February 1979

 

82/883/EEC

31 December 1984

 

92/112/EEC

15 June 1993

 

1999/13/EC

1 April 2001

 

2000/76/EC

28 December 2000

28 December 2002

28 December 2005

2001/80/EC

27 November 2002

27 November 2004

2003/35/EC

25 June 2005

 

2003/87/EC

31 December 2003

 

2008/1/EC

30 October 1999 (1)

30 October 1999

30 October 2007

(1)   

Directive 2008/1/EC is a codified version of Council Directive 96/61/EC of24 September 1996 concerning integrated pollution prevention and control (OJ L 257, 10.10.1996, p. 26) and the time-limits for transposition and application remain in force.

ANNEX X Correlation Table




ANNEX X

Correlation Table



Directive 78/176/EEC

Directive 82/883/EEC

Directive 92/112/EEC

Directive 2008/1/EC

Directive 1999/13/EC

Directive 2000/76/EC

Directive 2001/80/EC

This Directive

Article 1(1)

Article 1

Article 1

 

 

 

 

Article 66

—

—

—

—

—

—

—

Article 2

Article 1(2), point (a)

 

 

Article 2(2)

 

 

 

Article 3(2)

Article 1(2), point (b)

 

 

 

 

Article 3(1)

 

Article 3(37)

Article 1(2), points (c), (d) and (e)

 

 

 

 

 

 

—

—

—

—

—

—

—

—

Article 66

Article 2

 

 

 

 

 

 

Article 67

Article 3

 

 

 

 

 

 

Article 11, points (d) and (e)

Article 4

 

 

Article 4

Article 3, introductory wording and (1)

Article 4(1)

 

Article 4(1), first subparagraph

Article 5

 

 

 

 

 

 

Article 11, points (d) and (e)

Article 6

 

 

 

 

 

 

Article 11, points (d) and (e)

Article 7(1)

 

Article 10

 

 

 

 

Article 70(1) and 70(2), first sentence

Article 7(2) and (3)

 

 

 

 

 

 

—

—

—

—

—

—

—

—

Article 70(2), second sentence and 70(3)

Article 8(1)

 

 

 

 

 

 

—

Article 8(2)

 

 

 

 

 

 

Article 26(1), second subparagraph

Article 9

 

 

 

 

 

 

—

Article 10

 

 

 

 

 

 

—

Article 11

 

 

 

 

 

 

Article 12

Article 12

 

 

 

 

 

 

—

Article 13(1)

 

 

Article 17(1), first subparagraph and 17(3), first subparagraph, first sentence

Article 11(1), first sentence and 11(2)

 

 

Article 72(1), first sentence

—

—

—

—

—

—

—

Article 72(1), second sentence

Article 13(2), (3) and (4)

 

 

 

 

 

 

—

Article 14

 

 

 

 

 

 

—

Article 15

Article 14

Article 12

Article 21

Article 15

Article 21

Article 18(1) and (3)

Article 80

Article 16

Article 15

Article 13

Article 23

Article 17

Article 23

Article 20

Article 84

Annex I

 

 

 

 

 

 

—

Annex II section A introductory wording and point 1

 

 

 

 

 

 

—

Annex II section A point 2

 

 

 

 

 

 

—

Annex II section B

 

 

 

 

 

 

—

 

Article 2

 

 

 

 

 

—

 

Article 3

 

 

 

 

 

—

 

Article 4(1) and 4(2), first subparagraph

 

 

 

 

 

—

 

Article 4(2), second subparagraph

 

 

 

 

 

—

 

Article 4(3) and (4)

 

 

 

 

 

—

 

Article 5

 

 

 

 

 

—

 

Article 6

 

 

 

 

 

—

 

Article 7

 

 

 

 

 

—

 

Article 8

 

 

 

 

 

—

 

Article 9

 

 

 

 

 

—

 

Article 10

 

 

 

 

 

—

 

Article 11(1)

 

 

Article 13(1)

Article 17(1)

 

Article 75(1)

—

—

—

—

—

—

—

Article 75(2)

 

Article 11(2)

 

 

 

Article 17(2)

 

—

 

Article 11(3)

 

 

 

 

 

—

 

Article 12

 

 

 

 

 

—

 

Article 13

 

 

 

 

 

—

 

Annex I

 

 

 

 

 

—

 

Annex II

 

 

 

 

 

—

 

Annex III

 

 

 

 

 

—

 

Annex IV

 

 

 

 

 

—

 

Annex V

 

 

 

 

 

—

 

 

Article 2(1), introductory wording

 

 

 

 

—

 

 

Article 2(1)(a), introductory wording

 

 

 

 

—

 

 

Article 2(1)(a), first indent

 

 

 

 

Article 67, point (a)

 

 

Article 2(1)(a), second indent

 

 

 

 

Article 67, point (b)

 

 

Article 2(1)(a), third indent and 2(1)(b), third indent

 

 

 

 

Article 67, point (d)

 

 

Article 2(1)(a), fourth, fifth, sixth and seventh indent

 

 

 

 

—

 

 

Article 2(1)(b), introductory wording and first, fourth, fifth, sixth and seventh indent

 

 

 

 

—

 

 

Article 2(1)(b), second indent

 

 

 

 

Article 67, point (c)

 

 

Article 2(1)(c)

 

 

 

 

—

 

 

Article 2(2)

 

 

 

 

—

 

 

Article 3

 

 

 

 

Article 67

 

 

Article 4

 

 

 

 

Article 67

 

 

Article 5

 

 

 

 

—

 

 

Article 6, first paragraph, introductory wording

 

 

 

 

Article 68

 

 

Article 6, first paragraph, point (a)

 

 

 

 

Annex VIII, Part 1, point 1

 

 

Article 6, first paragraph, point (b)

 

 

 

 

Annex VIII, Part 1, point 2

 

 

Article 6, second paragraph

 

 

 

 

Annex VIII, Part 1, point 3

 

 

Article 7

 

 

 

 

—

 

 

Article 8

 

 

 

 

—

 

 

Article 9(1) introductory wording

 

 

 

 

Article 69(2)

 

 

Article 9(1)(a), introductory wording

 

 

 

 

—

 

 

Article 9(1)(a)(i)

 

 

 

 

Annex VIII, Part 2, point 2

 

 

Article 9(1)(a)(ii)

 

 

 

 

Annex VIII, Part 2, point 3, introductory wording, and point 3(a)

 

 

Article 9(1)(a)(iii)

 

 

 

 

Article 69(1)

 

 

Article 9(1)(a)(iv)

 

 

 

 

Annex VIII, Part 2, point 3(b)

 

 

Article 9(1)(a)(v)

 

 

 

 

—

 

 

Article 9(1)(b)

 

 

 

 

Annex VIII, Part 2, point 4

 

 

Article 9(2) and (3)

 

 

 

 

—

 

 

Article 11

 

 

 

 

Article 11, points (d) and (e)

 

 

Annex

 

 

 

 

—

 

 

 

Article 1

 

 

 

Article 1

 

 

 

Article 2, introductory wording

 

 

 

Article 3, introductory wording

 

 

 

Article 2(1)

Article 2(14)

 

 

Article 3(1)

 

 

 

Article 2(3)

Article 2(1)

 

 

Article 3(3)

 

 

 

Article 2(4)

 

 

 

—

 

 

 

Article 2(5)

Article 2(9)

Article 3(8)

Article 2(1)

Article 3(4)

 

 

 

Article 2(6), first sentence

Article 2(13)

Article 3(9)

Article 2(3), first part

Article 3(5)

 

 

 

Article 2(6), second sentence

 

 

 

Article 15(1)

 

 

 

Article 2(7)

 

 

 

Article 3(6)

 

 

 

Article 2(8)

Article 2(5)

 

 

Article 71

 

 

 

Article 2(9), first sentence

Article 2(7)

Article 3(12)

 

Article 3(7)

 

 

 

Article 2(9), second sentence

 

 

 

Article 4(2), first subparagraph

—

—

—

—

—

—

—

Article 4(2), second subparagraph

—

—

—

—

—

—

—

Article 4(3)

 

 

 

Article 2(10)

 

 

 

—

—

—

—

—

—

—

—

Article 3(8)

 

 

 

Article 2(11), first sentence

 

 

 

Article 3(9)

 

 

 

Article 2(11), second sentence

 

 

 

Article 20(3)

 

 

 

Article 2(12), first subparagraph and Annex IV, introductory wording

 

 

 

Article 3(10)

 

 

 

Article 2(12), second subparagraph

 

 

 

Articles 14(5), point (a) and 14(6)

 

 

 

Article 2(13)

Article 2(6)

Article 3(11)

Article 2(5)

Article 3(15)

 

 

 

Article 2(14)

 

 

 

Article 3(16)

 

 

 

Article 2(15)

 

 

 

Article 3(17)

—

—

—

—

—

—

—

Article 3(11) to (14), (18) to (23), (26) to (30) and (34) to (36)

 

 

 

Article 3(1), introductory wording

 

 

 

Article 11, introductory wording

 

 

 

Article 3(1), point (a)

 

 

 

Article 11, points (a) and (b)

 

 

 

Article 3(1), point (b)

 

 

 

Article 11, point (c)

 

 

 

Article 3(1), point (c)

 

 

 

Article 11, points (d) and (e)

 

 

 

Article 3(1), point (d)

 

 

 

Article 11, point (f)

 

 

 

Article 3(1), point (e)

 

 

 

Article 11, point (g)

 

 

 

Article 3(1), point (f)

 

 

 

Article 11, point (h)

 

 

 

Article 3(2)

 

 

 

—

 

 

 

Article 5(1)

 

 

 

—

 

 

 

Article 5(2)

 

 

 

Article 80(1), second subparagraph

 

 

 

Article 6(1), introductory wording

 

 

 

Article 12(1), first subparagraph, introductory wording

 

 

 

Article 6(1), first subparagraph, points (a) to (d)

 

 

 

Article 12(1), first subparagraph, points (a) to (d)

—

—

—

—

—

—

—

Article 12(1), first subparagraph, point (e)

 

 

 

Article 6(1), first subparagraph, point (e)

 

 

 

Article 12(1), first subparagraph, point (f)

 

 

 

Article 6(1), first subparagraph, point (f)

 

 

 

Article 12(1), first subparagraph, point (g)

 

 

 

Article 6(1), first subparagraph, point (g)

 

 

 

Article 12(1), first subparagraph, point (h)

 

 

 

Article 6(1), first subparagraph, point (h)

 

 

 

Article 12(1), first subparagraph, point (i)

 

 

 

Article 6(1), first subparagraph, point (i)

 

 

 

Article 12(1), first subparagraph, point (j)

 

 

 

Article 6(1), first subparagraph, point (j)

 

 

 

Article 12(1), first subparagraph, point (k)

 

 

 

Article 6(1), second subparagraph

 

 

 

Article 12(1), second subparagraph

 

 

 

Article 6(2)

 

 

 

Article 12(2)

 

 

 

Article 7

 

 

 

Article 5(2)

 

 

 

Article 8, first paragraph

 

Article 4(3)

 

Article 5(1)

 

 

 

Article 8, second paragraph

 

 

 

—

 

 

 

Article 9(1), first part of sentence

 

 

 

Article 14(1), first subparagraph

 

 

 

Article 9(1), second part of sentence

 

 

 

—

 

 

 

Article 9(2)

 

 

 

Article 5(3)

 

 

 

Article 9(3), first subparagraph, first and second sentence

 

 

 

Article 14(1), second subparagraph, introductory wording and points (a) and (b)

 

 

 

Article 9(3), first subparagraph, third sentence

 

 

 

Article 14(2)

—

—

—

—

—

—

—

Article 14(3), (4), and (7)

—

—

—

—

—

—

—

Article 14(5), introductory wording and point (b) of first subparagraph and Article 14(5), second subparagraph

 

 

 

Article 9(3), second subparagraph

 

 

 

—

 

 

 

Article 9(3), third subparagraph

 

 

 

Article 9(1)

 

 

 

Article 9(3), fourth subparagraph

 

 

 

Article 9(2)

 

 

 

Article 9(3), fifth subparagraph

 

 

 

Article 9(3)

 

 

 

Article 9(3), sixth subparagraph

 

 

 

Article 9(4)

—

—

—

—

—

—

—

Article 10

 

 

 

Article 9(4), first part of first sentence

 

 

 

Article 15(2)

 

 

 

Article 9(4), second part of first sentence

 

 

 

Article 15(4), first subparagraph

—

—

—

—

—

—

—

Article 15(4), second to fifth subparagraphs and Article 15(5)

 

 

 

Article 9(4), second sentence

 

 

 

Article 14(1), second subparagraph, point (g)

—

—

—

—

—

—

—

Article 14(1), second subparagraph, point (h)

—

—

—

—

—

—

—

Article 15(3)

—

—

—

—

—

—

—

Article 16

 

 

 

Article 9(5), first subparagraph

 

 

 

Article 14(1), second subparagraph, point (c)(i)

—

—

—

—

—

—

—

Article 14(1), second subparagraph, point (c)(ii)

—

—

—

—

—

—

—

Article 14(1), second subparagraph, point (d)

 

 

 

Article 9(5), second subparagraph

 

 

 

—

—

—

—

—

—

—

—

Article 14(1), second subparagraph, point (e)

 

 

 

Article 9(6), first subparagraph

 

 

 

Article 14(1), second subparagraph, point (f)

 

 

 

Article 9(6), second subparagraph

 

 

 

—

 

 

 

Article 9(7)

 

 

 

—

 

 

 

Article 9(8)

 

 

 

Article 6 and Article 17(1)

—

—

—

—

—

—

—

Article 17(2), (3) and (4)

 

 

 

Article 10

 

 

 

Article 18

 

 

 

Article 11

 

 

 

Article 19

 

 

 

Article 12(1)

 

 

 

Article 20(1)

 

 

 

Article 12(2), first sentence

 

 

 

Article 20(2), first subparagraph

 

 

 

Article 12(2), second sentence

 

 

 

Article 20(2), second subparagraph

 

 

 

Article 12(2), third sentence

 

 

 

—

 

 

 

Article 13(1)

 

 

 

Article 21(1)

—

—

—

—

—

—

—

Article 21(2), (3) and (4)

 

 

 

Article 13(2), introductory wording

 

 

 

Article 21(5), introductory wording

 

 

 

Article 13(2)(a)

 

 

 

Article 21(5), point (a)

 

 

 

Article 13(2)(b)

 

 

 

—

 

 

 

Article 13(2)(c)

 

 

 

Article 21(5), point (b)

 

 

 

Article 13(2)(d)

 

 

 

—

—

—

—

—

—

—

—

Article 21(5), point (c)

—

—

—

—

—

—

—

Article 22

—

—

—

—

—

—

—

Article 23(1), first subparagraph

 

 

 

Article 14, introductory wording and point (a)

 

 

 

Article 8(1)

 

 

 

Article 14, point (b)

 

 

 

Article 7, point (a) and Article 14(1), point (d)(i)

—

—

—

—

—

—

—

Article 7, introductory wording and points (b) and (c)

—

—

—

—

—

—

—

Article 14(1), point (d)(ii)

 

 

 

Article 14, point (c)

 

 

 

Article 23(1), second subparagraph

—

—

—

—

—

—

—

Article 23(2) to (6)

 

 

 

Article 15(1), first subparagraph, introductory wording and points (a) and (b)

Article 12(1), first subparagraph

 

 

Article 24(1), first subparagraph, introductory wording and points (a) and (b)

 

 

 

Article 15(1), first subparagraph, point (c)

 

 

 

Article 24(1), first subparagraph, point (c)

 

 

 

Article 15(1), second subparagraph

 

 

 

Article 24(1), second subparagraph

 

 

 

Article 15(2)

 

 

 

Article 24(3)(b)

 

 

 

Article 15(3)

 

 

 

Article 24(4)

 

 

 

Article 15(4)

 

 

 

Article 24(2), introductory wording and points (a) and (b)

—

—

—

—

—

—

—

Article 24(2), points (c) to (f) and Article 24(3), introductory wording and point (a)

 

 

 

Article 16

 

 

 

Article 25

 

 

 

Article 17(1), second subparagraph

 

 

 

—

 

 

 

Article 17(2), first subparagraph

 

 

 

Article 13(1)

—

—

—

—

—

—

—

Article 13(2) to (7)

 

 

 

Article 17(2), second subparagraph

 

 

 

—

 

 

 

Article 17(3), first subparagraph, second and third sentence

Article 11(1), second sentence

 

 

Article 72(2)

 

 

 

Article 17(3), first subparagraph, fourth sentence

 

 

 

—

—

—

—

—

—

—

—

Article 72(3) and (4)

 

 

 

Article 17(3), second subparagraph

 

 

 

—

 

 

 

Article 17(3), third subparagraph

Article 11(3)

 

 

Article 73(1)

—

—

—

—

—

—

—

Article 73(2)

 

 

 

Article 17(4)

 

 

 

—

—

—

—

—

—

—

—

Article 74

—

—

—

—

—

—

—

Article 27

 

 

 

Article 18

 

 

Article 11

Article 26

 

 

 

Article 19

 

 

 

—

 

 

 

Article 20

 

 

 

—

 

 

 

Article 21

 

 

 

Article 80(2)

 

 

 

Article 22

 

Article 18

Article 17

Article 81

—

—

—

—

—

—

—

Article 82

 

 

 

Article 23

Article 16

Article 22

Article 19

Article 83

—

—

—

—

—

—

—

Article 2(1)

 

 

 

Annex I, paragraph 1 of introductory wording

 

 

 

Article 2(2)

 

 

 

Annex I, paragraph 2 of introductory wording

 

 

 

Annex I, first subparagraph of introductory wording, first sentence

—

—

—

—

—

—

—

Annex I, first subparagraph of introductory wording, second sentence

—

—

—

—

—

—

—

Annex I, second subparagraph of introductory wording

 

 

 

Annex I, points 1.1 to 1.3

 

 

 

Annex I, points 1.1 to 1.3

 

 

 

Annex I, point 1.4

 

 

 

Annex I, point 1.4(a)

—

—

—

—

—

—

—

Annex I, point 1.4(b)

 

 

 

Annex I, point 2

 

 

 

Annex I, point 2

 

 

 

Annex I, point 3.1

 

 

 

Annex I, point 3.1(a) and (b)

—

—

—

—

—

—

—

Annex I, point 3.1(c)

 

 

 

Annex I, points 3.2 to 3.5

 

 

 

Annex I, points 3.2 to 3.5

 

 

 

Annex I, point 4

 

 

 

Annex I, point 4

 

 

 

Annex I, point 5, introductory wording

 

 

 

—

 

 

 

Annex I, point 5.1

 

 

 

Annex I, points 5.1(b), (f), (g), (i), (j) and 5.2(b)

—

—

—

—

—

—

—

Annex I, points 5.1(a), (c), (d), (e), (h), (k)

 

 

 

Annex I, point 5.2

 

 

 

Annex I, point 5.2(a)

 

 

 

Annex I, point 5.3

 

 

 

Annex I, point 5.3(a)(i) and (ii)

—

—

—

—

—

—

—

Annex I, point 5.3(a)(iii) to (v) and 5.3(b)

 

 

 

Annex I, point 5.4

 

 

 

Annex I, point 5.4

—

—

—

—

—

—

—

Annex I, points 5.5 and 5.6

 

 

 

Annex I, points 6.1(a) and (b)

 

 

 

Annex I, points 6.1(a) and (b)

—

—

—

—

—

—

—

Annex I, point 6.1(c)

 

 

 

Annex I, points 6.2 – 6.4(b)

 

 

 

Annex I, points 6.2 – 6.4(b)(ii)

—

—

—

—

—

—

—

Annex I, point 6.4 (b)(iii)

 

 

 

Annex I, points 6.4(c) – 6.9

 

 

 

Annex I, points 6.4(c) – 6.9

—

—

—

—

—

—

—

Annex I, points 6.10 and 6.11

 

 

 

Annex II

 

 

 

—

 

 

 

Annex III

 

 

 

Annex II, ‘Air’, and ‘Water’, points 1 to 12

—

—

—

—

—

—

—

Annex II, ‘Water’, point 13

 

 

 

Annex IV

 

 

 

Annex III

 

 

 

Annex V

 

 

 

Annex IV

 

 

 

 

Article 1

 

 

Article 56

 

 

 

 

Article 2(2)

 

 

Article 57(1)

 

 

 

 

Article 2(3)

 

 

—

 

 

 

 

Article 2(4)

 

 

Article 63(1)

 

 

 

 

Article 2(8)

 

 

Article 4(1), third subparagraph

 

 

 

 

Article 2(10)

 

 

Article 57(3)

 

 

 

 

Article 2(11)

 

 

Article 57(2)

 

 

 

 

Article 2(12)

 

 

Article 57(4)

 

 

 

 

Article 2(15)

 

 

Article 57(5)

 

 

 

 

Article 2(16)

 

 

Article 3(44)

 

 

 

 

Article 2(17)

 

 

Article 3(45)

 

 

 

 

Article 2(18)

 

 

Article 3(46)

 

 

 

 

Article 2(19)

 

 

—

 

 

 

 

Article 2(20)

 

 

Article 3(47)

 

 

 

 

Article 2(21)

 

 

Article 57(6)

 

 

 

 

Article 2(22)

 

 

Article 57(7)

 

 

 

 

Article 2(23)

 

 

Article 57(8)

 

 

 

 

Article 2(24)

 

 

Article 57(9)

 

 

 

 

Article 2(25)

 

 

Article 57(10)

 

 

 

 

Article 2(26)

 

 

Article 57(11)

 

 

 

 

Article 2(27)

 

 

—

 

 

 

 

Article 2(28)

 

 

Article 63(1)

 

 

 

 

Article 2(29)

 

 

—

 

 

 

 

Article 2(30)

 

 

Article 57(12)

 

 

 

 

Article 2(31)

 

 

Annex VII, Part 2, first sentence

Annex VIII, Part 2, point 1

 

 

 

 

Article 2(32)

 

 

—

 

 

 

 

Article 2(33)

 

 

Article 57(13)

 

 

 

 

Article 3(2)

 

 

Article 4(1), second subparagraph

 

 

 

 

Article 4(1), (2) and(3)

 

 

Article 4(1), first and second subparagraph

 

 

 

 

Article 4(4)

 

 

Article 63(2)

 

 

 

 

Article 5(1)

 

 

Article 59(1), first subparagraph, introductory wording

 

 

 

 

Article 5(2)

 

 

Article 59(1) first subparagraph, points (a) and (b)

 

 

 

 

Article 5(3), first subparagraph, point (a)

 

 

Article 59(2)

 

 

 

 

Article 5(3), first subparagraph, point (b)

 

 

Article 59(3)

 

 

 

 

Article 5(3), second subparagraph

 

 

Article 59(4)

—

—

—

—

—

—

—

Article 59(5)

 

 

 

 

Article 5(4)

 

 

—

 

 

 

 

Article 5(5)

 

 

Article 59(6)

 

 

 

 

Article 5(6)

 

 

Article 58

 

 

 

 

Article 5(7)

 

 

Annex VII, Part 4, point 1

 

 

 

 

Article 5(8) first subparagraph

 

 

Annex VII, Part 4, point 2

 

 

 

 

Article 5(8) second subparagraph

 

 

—

 

 

 

 

Article 5(9)

 

 

—

 

 

 

 

Article 5(10)

 

 

Article 59(7)

 

 

 

 

Article 5(11), (12) and (13)

 

 

—

 

 

 

 

Article 6

 

 

—

 

 

 

 

Article 7(1), introductory wording and first, second, third and fourth indent

 

 

Article 64

 

 

 

 

Article 7(1), closing wording

 

 

—

 

 

 

 

Article 7(2)

 

 

—

 

 

 

 

Article 8(1)

 

 

Article 14(1), point (d), Article 60

—

—

—

—

—

—

—

Article 61

 

 

 

 

Article 8(2)

 

 

Annex VII, Part 6, point 1

 

 

 

 

Article 8(3)

 

 

Annex VII, Part 6, point 2

 

 

 

 

Article 8(4)

 

 

Annex VII Part 6, point 3

 

 

 

 

Article 8(5)

 

 

—

 

 

 

 

Article 9(1), first subparagraph, introductory wording

 

 

Article 62, first subparagraph, introductory wording

 

 

 

 

Article 9(1), first subparagraph, first, second and third indent

 

 

Article 62, first subparagraph, points (a), (b) and (c)

 

 

 

 

Article 9(1), second subparagraph

 

 

Article 62, second subparagraph

 

 

 

 

Article 9(1), third subparagraph

 

 

Annex VII, Part 8, point 4

 

 

 

 

Article 9(2)

 

 

Article 63(3)

 

 

 

 

Article 9(3)

 

 

Annex VII, Part 8, point 1

 

 

 

 

Article 9(4)

 

 

Annex VII, Part 8, point 2

 

 

 

 

Article 9(5)

 

 

Annex VII, Part 8, point 3

 

 

 

 

Article 10

Article 4(9)

 

Article 8(2)

 

 

 

 

Article 11(1), third to sixth sentences

 

 

—

 

 

 

 

Article 12(1), second subparagraph

 

 

Article 65(1), first subparagraph

 

 

 

 

Article 12(1), third subparagraph

 

 

Article 65(1), second subparagraph

 

 

 

 

Article 12(2)

 

 

Article 65(2)

 

 

 

 

Article 12(3)

 

 

Article 65(3)

 

 

 

 

Article 13(2) and (3)

 

 

—

 

 

 

 

Article 14

Article 19

Article 16

Article 79

 

 

 

 

Annex I, first and second sentence of introductory wording

 

 

Article 56

 

 

 

 

Annex I, third sentence of introductory wording and list of activities

 

 

Annex VII, Part 1

 

 

 

 

Annex IIA

 

 

Annex VII, Parts 2 and 3

 

 

 

 

Annex IIA, Part II, last sentence of paragraph 6

 

 

—

 

 

 

 

Annex IIB, point 1, first and second sentences

 

 

Article 59(1), first subparagraph, point (b)

 

 

 

 

Annex IIB, point 1, third sentence

 

 

Article 59(1), second subparagraph

 

 

 

 

Annex IIB, point 2

 

 

Annex VII, Part 5

 

 

 

 

Annex IIB, point 2, second subparagraph (i) and table

 

 

—

 

 

 

 

Annex III, point 1

 

 

—

 

 

 

 

Annex III, point 2

 

 

Annex VII, Part 7, point 1

 

 

 

 

Annex III, point 3

 

 

Annex VII, Part 7, point 2

 

 

 

 

Annex III, point 4

 

 

Annex VII, Part 7, point 3

 

 

 

 

 

Article 1, first paragraph

 

Article 42

 

 

 

 

 

Article 1, second paragraph

 

—

 

 

 

 

 

Article 2(1)

 

Article 42(1), first subparagraph

—

—

—

—

—

—

—

Article 42(1), second to fifth subparagraphs

 

 

 

 

 

Article 2(2), introductory wording

 

Article 42(2), introductory wording

 

 

 

 

 

Article 2(2)(a), introductory wording

 

Article 42(2)(a), introductory wording

 

 

 

 

 

Article 2(2)(a), points (i) to (v)

 

Article 42(2)(a), point (i)

 

 

 

 

 

Article 2(2)(a), point (vi)

 

Article 42(2)(a), point (ii)

 

 

 

 

 

Article 2(2)(a), point (vii)

 

Article 42(2)(a), point (iii)

 

 

 

 

 

Article 2(2)(a), point (viii)

 

Article 42(2)(a), point (iv)

 

 

 

 

 

Article 2(2)(b)

 

Article 42(2)(b)

 

 

 

 

 

Article 3(2), first subparagraph

 

Article 3(38)

 

 

 

 

 

Article 3(2), second subparagraph

 

—

 

 

 

 

 

Article 3(3)

 

Article 3(39)

 

 

 

 

 

Article 3(4), first subparagraph

 

Article 3(40)

 

 

 

 

 

Article 3(4), second subparagraph

 

Article 42(1), third subparagraph

—

—

—

—

—

—

—

Article 42(1), fourth subparagraph

 

 

 

 

 

Article 3(5), first subparagraph

 

Article 3(41)

 

 

 

 

 

Article 3(5), second subparagraph

 

Article 42(1), fifth subparagraph

 

 

 

 

 

Article 3(5), third subparagraph

 

Article 42(1), third subparagraph

 

 

 

 

 

Article 3(6)

 

Annex VI, Part 1, point (a)

 

 

 

 

 

Article 3(7)

 

Article 3(42)

—

—

—

—

—

—

—

Annex VI, Part 1, point (b)

 

 

 

 

 

Article 3(10)

 

Article 3(43)

 

 

 

 

 

Article 3(13)

 

Article 43

 

 

 

 

 

Article 4(2)

 

Article 44

 

 

 

 

 

Article 4(4), introductory wording and points (a) and (b)

 

Article 45(1), introductory wording and points (a) and (b)

 

 

 

 

 

Article 4(4), point (c)

 

Article 45(1), point (e)

 

 

 

 

 

Article 4(5)

 

Article 45(2)

 

 

 

 

 

Article 4(6)

 

Article 45(3)

 

 

 

 

 

Article 4(7)

 

Article 45(4)

 

 

 

 

 

Article 4(8)

 

Article 54

 

 

 

 

 

Article 5

 

Article 52

 

 

 

 

 

Article 6(1), first subparagraph

 

Article 50(1)

 

 

 

 

 

Article 6(1), second subparagraph and 6(2)

 

Article 50(2)

 

 

 

 

 

Article 6(1), third subparagraph

 

Article 50(3), first subparagraph

 

 

 

 

 

Article 6(1), first part of fourth subparagraph

 

—

 

 

 

 

 

Article 6(1), second part of fourth subparagraph

 

Article 50(3), second subparagraph

 

 

 

 

 

Article 6(3)

 

Article 50(4)

 

 

 

 

 

Article 6(4), first and second sentences of first subparagraph and Article 6(4), first and second sentences of second subparagraph

 

Article 51(1)

 

 

 

 

 

Article 6(4), third sentence of first subparagraph

 

Article 51(2)

—

—

—

—

—

Article 6(4), third sentence of second subparagraph

—

Article 51(3), first subparagraph

 

 

 

 

 

Article 6(4), third subparagraph

 

Article 51(3), second subparagraph

 

 

 

 

 

Article 6(4), fourth subparagraph

 

Article 51(4)

 

 

 

 

 

Article 6(5), first part of sentence

 

—

 

 

 

 

 

Article 6(5), second part of the sentence

 

Article 46(1)

 

 

 

 

 

Article 6(6)

 

Article 50(5)

 

 

 

 

 

Article 6(7)

 

Article 50(6)

 

 

 

 

 

Article 6(8)

 

Article 50(7)

 

 

 

 

 

Article 7(1) and Article 7(2), first subparagraph

 

Article 46(2), first subparagraph

 

 

 

 

 

Article 7(2), second subparagraph

 

Article 46(2), second subparagraph

 

 

 

 

 

Article 7(3) and Article 11(8), first subparagraph, introductory wording

 

Annex VI, Part 6, first part of point 2.7

 

 

 

 

 

Article 7(4)

 

Article 46(2), second subparagraph

 

 

 

 

 

Article 7(5)

 

—

 

 

 

 

 

Article 8(1)

 

Article 45(1), point (c)

 

 

 

 

 

Article 8(2)

 

Article 46(3)

 

 

 

 

 

Article 8(3)

 

—

 

 

 

 

 

Article 8(4), first subparagraph

 

Article 46(4), first subparagraph

 

 

 

 

 

Article 8(4), second subparagraph

 

Annex VI, Part 6, point 3.2

 

 

 

 

 

Article 8(4), third subparagraph

 

—

 

 

 

 

 

Article 8(4), fourth subparagraph

 

—

 

 

 

 

 

Article 8(5)

 

Article 46(4), second and third subparagraph

 

 

 

 

 

Article 8(6)

 

Article 45(1), points (c) and (d)

 

 

 

 

 

Article 8(7)

 

Article 46(5)

 

 

 

 

 

Article 8(8)

 

—

 

 

 

 

 

Article 9, first subparagraph

 

Article 53(1)

 

 

 

 

 

Article 9, second subparagraph

 

Article 53(2)

 

 

 

 

 

Article 9, third subparagraph

 

Article 53(3)

 

 

 

 

 

Article 10(1) and (2)

 

—

 

 

 

 

 

Article 10(3), first sentence

 

Article 48(2)

 

 

 

 

 

Article 10(3), second sentence

 

—

 

 

 

 

 

Article 10(4)

 

Article 48(3)

 

 

 

 

 

Article 10(5)

 

Annex VI, Part 6, second part of point 1.3

 

 

 

 

 

Article 11(1)

 

Article 48(1)

 

 

 

 

 

Article 11(2)

 

Annex VI, Part 6, point 2.1

 

 

 

 

 

Article 11(3)

 

Annex VI, Part 6, point 2.2

 

 

 

 

 

Article 11(4)

 

Annex VI, Part 6, point 2.3

 

 

 

 

 

Article 11(5)

 

Annex VI, Part 6, point 2.4

 

 

 

 

 

Article 11(6)

 

Annex VI, Part 6, point 2.5, first subparagraph

—

—

—

—

—

—

—

Annex VI, Part 6, point 2.5, second subparagraph

 

 

 

 

 

Article 11(7), first part of first sentence of first subparagraph

 

Annex VI, Part 6, point 2.6, introductory wording

 

 

 

 

 

Article 11(7), second part of first sentence of first subparagraph

 

Annex VI, Part 6, point 2.6(a)

 

 

 

 

 

Article 11(7), second sentence of first subparagraph

 

—

 

 

 

 

 

Article 11(7), second subparagraph

 

—

 

 

 

 

 

Article 11(7), point (a)

 

Annex VI, Part 6, point 2.6(b)

 

 

 

 

 

Article 11(7), points (b) and (c)

 

—

 

 

 

 

 

Article 11(7), point (d)

 

Annex VI, Part 6, point 2.6(c)

 

 

 

 

 

Article 11(7), points (e) and (f)

 

—

 

 

 

 

 

Article 11(8), first subparagraph, points (a) and (b)

 

Annex VI, Part 3, point 1

 

 

 

 

 

Article 11(8), first subparagraph, point (c) and second subparagraph

 

Annex VI, Part 6, second subparagraph of point 2.7

 

 

 

 

 

Article 11(8), first subparagraph, point (d)

 

Annex VI, Part 4, point 2.1, second subparagraph

 

 

 

 

 

Article 11(9)

 

Article 48(4)

 

 

 

 

 

Article 11(10)

 

Annex VI, Part 8, point 1.1

 

 

 

 

 

Article 11(11)

 

Annex VI, Part 8, point 1.2

 

 

 

 

 

Article 11(12)

 

Annex VI, Part 8, point 1.3

 

 

 

 

 

Article 11(13)

 

Article 48(5)

—

—

—

—

—

—

—

Article 49

 

 

 

 

 

Article 11(14)

 

Annex VI, Part 6, point 3.1

 

 

 

 

 

Article 11(15)

 

Article 45(1), point (e)

 

 

 

 

 

Article 11(16)

 

Annex VI, Part 8, point 2

 

 

 

 

 

Article 11(17)

 

Article 8(2), point (a)

 

 

 

 

 

Article 12(1)

 

Article 55(1)

 

 

 

 

 

Article 12(2), first and second sentence

 

Article 55(2)

 

 

 

 

 

Article 12(2), third sentence

 

Article 55(3)

 

 

 

 

 

Article 13(1)

 

Article 45(1), point (f)

 

 

 

 

 

Article 13(2)

 

Article 47

 

 

 

 

 

Article 13(3)

 

Article 46(6)

 

 

 

 

 

Article 13(4)

 

Annex VI, Part 3, point 2

 

 

 

 

 

Article 14

 

—

 

 

 

 

 

Article 15

 

—

 

 

 

 

 

Article 16

 

—

 

 

 

 

 

Article 20

 

—

 

 

 

 

 

Annex I

 

Annex VI, Part 2

 

 

 

 

 

Annex II, first part (without numbering)

 

Annex VI, Part 4, point 1

 

 

 

 

 

Annex II, point 1, introductory wording

 

Annex VI, Part 4, point 2.1

 

 

 

 

 

Annex II, points 1.1 and 1.2

 

Annex VI, Part 4, points 2.2 and 2.3

—

—

—

—

—

—

—

Annex VI, Part 4, point 2.4

 

 

 

 

 

Annex II, point 1.3

 

—

 

 

 

 

 

Annex II, point 2.1

 

Annex VI, Part 4, point 3.1

—

—

—

—

—

—

—

Annex VI, Part 4, point 3.2

 

 

 

 

 

Annex II, point 2.2

 

Annex VI, Part 4, point 3.3 and 3.4

 

 

 

 

 

Annex II, point 3

 

Annex VI, Part 4, point 4

 

 

 

 

 

Annex III

 

Annex VI, Part 6, point 1

 

 

 

 

 

Annex IV, table

 

Annex VI, Part 5

 

 

 

 

 

Annex IV, final sentence

 

—

 

 

 

 

 

Annex V, point (a), table

 

Annex VI, Part 3, point 1.1

 

 

 

 

 

Annex V, point (a), final sentences

 

—

 

 

 

 

 

Annex V, point (b), table

 

Annex VI, Part 3, point 1.2

 

 

 

 

 

Annex V, point (b), final sentence

 

—

 

 

 

 

 

Annex V, point (c)

 

Annex VI, Part 3, point 1.3

 

 

 

 

 

Annex V, point (d)

 

Annex VI, Part 3, point 1.4

 

 

 

 

 

Annex V, point (e)

 

Annex VI, Part 3, point 1.5

 

 

 

 

 

Annex V, point (f)

 

Annex VI, Part 3, point 3

 

 

 

 

 

Annex VI

 

Annex VI, Part 7

 

 

 

 

 

 

Article 1

Article 28, first subparagraph

 

 

 

 

 

 

Article 2(2)

Annex V, Part 1, point 1 and Part 2, point 1, first subparagraph

—

—

—

—

—

—

—

Annex V, Part 1, point 1 and Part 2, point 1, second subparagraph

 

 

 

 

 

 

Article 2(3) second part

Annex V, Part 1, point 1 and Part 2, point 1, first subparagraph

—

—

—

—

—

—

—

Annex V, Part 1, point 1 and Part 2, point 1, second subparagraph

 

 

 

 

 

 

Article 2(4)

—

 

 

 

 

 

 

Article 2(6), first part

Article 3(24)

 

 

 

 

 

 

Article 2(6), second part

Article 28, second subparagraph, point (j)

 

 

 

 

 

 

Article 2(7), first subparagraph

Article 3(25)

 

 

 

 

 

 

Article 2(7), second subparagraph, first sentence

—

 

 

 

 

 

 

Article 2(7), second subparagraph, second sentence and points (a) to (i)

Article 28, second subparagraph and points (a) to (i)

 

 

 

 

 

 

Article 2(7), second subparagraph, point (j)

—

 

 

 

 

 

 

Article 2(7), third subparagraph

—

—

—

—

—

—

—

—

Article 29(1)

 

 

 

 

 

 

Article 2(7), fourth subparagraph

Article 29(2)

—

—

—

—

—

—

—

Article 29(3)

 

 

 

 

 

 

Article 2(8)

Article 3(32)

 

 

 

 

 

 

Article 2(9)

—

 

 

 

 

 

 

Article 2(10)

—

 

 

 

 

 

 

Article 2(11)

Article 3(31)

 

 

 

 

 

 

Article 2(12)

Article 3(33)

 

 

 

 

 

 

Article 2(13)

—

 

 

 

 

 

 

Article 3

—

 

 

 

 

 

 

Article 4(1)

—

 

 

 

 

 

 

Article 4(2)

—

 

 

 

 

 

 

Article 4(3)to 4(8)

 

 

 

 

 

 

 

Article 5(1)

Annex V, Part 1, point 2, second subparagraph

 

 

 

 

 

 

 

Annex V, Part 1, point 2, first, third and fourth subparagraphs

 

 

 

 

 

 

Article 5(2)

—

 

 

 

 

 

 

Article 6

—

 

 

 

 

 

 

Article 7(1)

Article 37

 

 

 

 

 

 

Article 7(2)

Article 30(5)

 

 

 

 

 

 

Article 7(3)

Article 30(6)

 

 

 

 

 

 

Article 8(1)

Article 40(1)

 

 

 

 

 

 

Article 8(2), first part of first subparagraph

Article 40(2), first part of first subparagraph

 

 

 

 

 

 

Article 8(2), second part of first subparagraph

—

—

—

—

—

—

—

—

Article 40(2), second part of first subparagraph

—

—

—

—

—

—

—

Article 40(2), second subparagraph

—

—

—

—

—

—

—

Article 40(3)

—

—

—

—

—

—

—

Article 41

 

 

 

 

 

 

Article 8(2), second subparagraph

—

 

 

 

 

 

 

Article 8(3) and (4)

—

 

 

 

 

 

 

Article 9

Article 30(1)

—

—

—

—

—

—

—

Article 30(2), (3) and (4)

 

 

 

 

 

 

Article 9a

Article 36

 

 

 

 

 

 

Article 10, first paragraph, first sentence

Article 30(7), first sentence

—

—

—

—

—

—

—

Article 30(7), second sentence

—

—

—

—

—

—

—

Article 30(8) and (9)

—

—

—

—

—

—

—

Article 31 to 35

 

 

 

 

 

 

Article 10, first paragraph, second sentence

—

 

 

 

 

 

 

Article 10, second paragraph

—

 

 

 

 

 

 

Article 12, first sentence

Article 38(1)

 

 

 

 

 

 

Article 12, second sentence

—

—

—

—

—

—

—

—

Article 38(2), (3) and (4)

—

—

—

—

—

—

—

Article 39

 

 

 

 

 

 

Article 13

Annex V, Part 3, third part of point 8

 

 

 

 

 

 

Article 14

Annex V, Part 4

—

—

—

—

—

—

—

Annex V, Part 5, 6 and 7

 

 

 

 

 

 

Article 15

—

 

 

 

 

 

 

Article 18(2)

—

 

 

 

 

 

 

Annex I

—

 

 

 

 

 

 

Annex II

—

 

 

 

 

 

 

Annex III and IV

Annex V, point 2 of Part 1 and Part 2

 

 

 

 

 

 

Annex V A

Annex V, Part 1, point 3

 

 

 

 

 

 

Annex V B

Annex V, Part 2, point 3

 

 

 

 

 

 

Annex VI A

Annex V, Part 1, points 4 and 6

—

—

—

—

—

—

—

Annex V, Part 1, point 5

 

 

 

 

 

 

Annex VI B

Annex V, Part 2, points 4 and 6

—

—

—

—

—

—

—

Annex V, Part 2, point 5

 

 

 

 

 

 

Annex VII A

Annex V, Part 1, points 7 and 8

 

 

 

 

 

 

Annex VII B

Annex V, Part 2, points 7 and 8

 

 

 

 

 

 

Annex VIII A point 1

—

 

 

 

 

 

 

Annex VIII A point 2

Annex V, Part 3, first part of point 1 and points 2, 3 and 5

—

—

—

—

—

—

—

Annex V, Part 3, second part of point 1

—

—

—

—

—

—

—

Annex V, Part 3, point 4

 

 

 

 

 

 

Annex VIII A point 3

—

 

 

 

 

 

 

Annex VIII A point 4

Annex V, Part 3, point 6

 

 

 

 

 

 

Annex VIII A point 5

Annex V, Part 3, points 7 and 8

 

 

 

 

 

 

Annex VIII A point 6

Annex V, Part 3, points 9 and 10

—

—

—

—

—

—

—

Annex V, Part 3, point 11

—

—

—

—

—

—

—

Annex V, Part 4

 

 

 

 

 

 

Annex VIII B

—

 

 

 

 

 

 

Annex VIII C

—

 

 

 

Annex VI

 

 

Annex IX

Annex IX

 

 

 

Annex VII

 

 

Annex X

Annex X

1.1 Nuorodos

1.2 Nustatyti reikalavimai

1.3 Susiję standartai

2. Nustatyti reikalavimai

Reikalavimai
Šaltinis Reikalavimas

3. Susiję standartai

Standartai
Šaltinis Reikalavimas

Susietos užduotys