|
+Article 58 5. |
Article 58 5.Without prejudice to Article 5(3), Article 18(2) and, where applicable, Directive 2008/57/EC and Commission Regulation (EU) No 1302/2014 (
8
), transition engines and, where applicable, the non-road mobile machinery in which those transition engines are installed may continue to be placed on the market during the transition period provided that the machinery in which the transition engine is installed has a production date not later than 18 months following the start of the transition period. For engines of sub-categories of category NRE for which the date set out in Annex III for the placing on the market of Stage V engines is 1 January 2020, Member States shall authorise the extension of the transition period and of the 18-month period referred to in the first subparagraph by an additional 12 months for OEMs with a total yearly production of less than 100 units of non-road mobile machinery equipped with internal combustion engines. For the purposes of the calculation of that total yearly production, all OEMs under the control of the same natural or legal person shall be considered to be a single OEM. For engines of sub-categories of category NRE for which the date set out in Annex III for the placing on the market of Stage V engines is 1 January 2020, used in mobile cranes, the transition period and the 18-month period referred to in the first subparagraph shall be extended by 12 months. For engines of category NRS with an engine power of less than 19 kW used in snow throwers, the transition period and the 18-month period referred to in the first subparagraph shall be extended by 24 months. For engines of all sub-categories for which the date set out in Annex III for the placing on the market of Stage V engines is 1 January 2019, except for the engines referred to in the fourth subparagraph, the transition period and the 18-month period referred to in the first subparagraph shall be extended by 12 months. For engines of all sub-categories for which the date set out in Annex III for the placing on the market of Stage V engines is 1 January 2020, except for the engines referred to in the second and third subparagraphs, the transition period shall be extended by nine months and the 18-month period referred to in the first subparagraph shall be extended by six months. 1. Pregled
1.1 Sklici1.2 Ugotovljene zahteve1.3 Povezani standardi2. Ugotovljene zahteve
3. Povezani standardi
|