+DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)
|
DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)
Together with the contact person of the organisation to be audited, the IS Audit Team SHOULD draw up a schedule for the on-site audit. The results SHOULD be documented along with the IS Gap Analysis Plan.
1. Přehled
1.1 Odkazy
1.2 Identifikované požadavky
1.3 Související regulace
2. Identifikované požadavky
Požadavky
| Zdroj |
Požadavek |
3. Související regulace
Propojené úkoly
|