+DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)

DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)

Together with the contact person of the organisation to be audited, the IS Audit Team SHOULD draw up a schedule for the on-site audit. The results SHOULD be documented along with the IS Gap Analysis Plan.

1. Přehled

Název Standard

1.1 Odkazy

1.2 Identifikované požadavky

1.3 Související regulace

2. Identifikované požadavky

Požadavky
Zdroj Požadavek

3. Související regulace

Regulace
Zdroj Regulace

Propojené úkoly