+DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)

DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)

Together with the contact person of the organisation to be audited, the IS Audit Team SHOULD draw up a schedule for the on-site audit. The results SHOULD be documented along with the IS Gap Analysis Plan.

1. Pregled

Naslov Standard

1.1 Sklici

1.2 Ugotovljene zahteve

1.3 Povezani predpisi

2. Ugotovljene zahteve

Zahteve
Vir Zahteva

3. Povezani predpisi

Predpisi
Vir Regulativa

Povezane zadeve

Povezave
Vrsta povezave Zadeva
blocks G 0.18 Poor Planning or Lack of Adaptation