+DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)

DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)

Together with the contact person of the organisation to be audited, the IS Audit Team SHOULD draw up a schedule for the on-site audit. The results SHOULD be documented along with the IS Gap Analysis Plan.

1. Resumen

Título Estándar

1.1 Referencias

1.2 Requisitos identificados

1.3 Regulaciones relacionadas

2. Requisitos identificados

Requisitos
Fuente Requisito

3. Regulaciones relacionadas

Regulaciones
Fuente Regulación

Incidencias vinculadas

Vínculos
Tipo de vínculo Incidencia
blocks G 0.18 Poor Planning or Lack of Adaptation