+DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)
|
DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)
Together with the contact person of the organisation to be audited, the IS Audit Team SHOULD draw up a schedule for the on-site audit. The results SHOULD be documented along with the IS Gap Analysis Plan.
1. Prehľad
1.1 Odkazy
1.2 Identifikované požiadavky
1.3 Súvisiace predpisy
2. Identifikované požiadavky
Požiadavky
| Zdroj |
Požiadavka |
3. Súvisiace predpisy
Prepojené úlohy
|