|
+DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S) |
DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)Together with the contact person of the organisation to be audited, the IS Audit Team SHOULD draw up a schedule for the on-site audit. The results SHOULD be documented along with the IS Gap Analysis Plan. 1. Pregled
1.1 Reference1.2 Utvrđeni zahtjevi1.3 Povezani propisi2. Utvrđeni zahtjevi
3. Povezani propisi
Povezani zadaci
|