+DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)
|
DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)
Together with the contact person of the organisation to be audited, the IS Audit Team SHOULD draw up a schedule for the on-site audit. The results SHOULD be documented along with the IS Gap Analysis Plan.
1. Panoramica
1.1 Riferimenti
1.2 Requisiti identificati
1.3 Regolamentazioni correlate
2. Requisiti identificati
Requisiti
| Fonte |
Requisito |
3. Regolamentazioni correlate
Regolamentazioni
| Fonte |
Regolamentazione |
Ticket collegati
|