+DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)

DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)

Together with the contact person of the organisation to be audited, the IS Audit Team SHOULD draw up a schedule for the on-site audit. The results SHOULD be documented along with the IS Gap Analysis Plan.

1. Panoramica

Titolo Standard

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Regolamentazioni correlate

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Regolamentazioni correlate

Regolamentazioni
Fonte Regolamentazione

Ticket collegati

Collegamenti
Tipo di collegamento Ticket
blocks G 0.18 Poor Planning or Lack of Adaptation