+4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …

4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …

4.

For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 LDAR surveys shall be carried out every 12 months.

Part 2

Information requirements on devices used in LDAR surveys

As part of the LDAR programme referred to in Article 14 (1), operators must provide the following:

1. Resumen

,
Título Regulación

1.1 Referencias

1.2 Requisitos identificados

1.3 Estándares relacionados

2. Requisitos identificados

Requisitos
Fuente Requisito

3. Estándares relacionados

Estándares
Fuente Requisito