+4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …
|
4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …
|
4.
|
For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 LDAR surveys shall be carried out every 12 months.
|
Part 2 Information requirements on devices used in LDAR surveys As part of the LDAR programme referred to in Article 14 (1), operators must provide the following:
1. Prehľad
1.1 Odkazy
1.2 Identifikované požiadavky
1.3 Súvisiace štandardy
2. Identifikované požiadavky
Požiadavky
| Zdroj |
Požiadavka |
3. Súvisiace štandardy
Štandardy
| Zdroj |
Požiadavka |
|