+4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …

4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …

4.

For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 LDAR surveys shall be carried out every 12 months.

Part 2

Information requirements on devices used in LDAR surveys

As part of the LDAR programme referred to in Article 14 (1), operators must provide the following:

1. Vue d’ensemble

,
Intitulé Réglementation

1.1 Références

1.2 Exigences identifiées

1.3 Normes associées

2. Exigences identifiées

Exigences
Source Exigence

3. Normes associées

Normes
Source Exigence