+4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …
|
4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …
|
4.
|
For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 LDAR surveys shall be carried out every 12 months.
|
Part 2 Information requirements on devices used in LDAR surveys As part of the LDAR programme referred to in Article 14 (1), operators must provide the following:
1. Forbhreathnú
1.1 Tagairtí
1.2 Ceanglais aitheanta
1.3 Caighdeáin ghaolmhara
2. Ceanglais aitheanta
Ceanglais
| Foinse |
Ceanglas |
3. Caighdeáin ghaolmhara
Caighdeáin
| Foinse |
Ceanglas |
|