+4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …
|
4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …
|
4.
|
For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 LDAR surveys shall be carried out every 12 months.
|
Part 2 Information requirements on devices used in LDAR surveys As part of the LDAR programme referred to in Article 14 (1), operators must provide the following:
1. Visão geral
1.1 Referências
1.2 Requisitos identificados
1.3 Normas relacionadas
2. Requisitos identificados
Requisitos
| Fonte |
Requisito |
3. Normas relacionadas
|