+4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …

4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …

4.

For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 LDAR surveys shall be carried out every 12 months.

Part 2

Information requirements on devices used in LDAR surveys

As part of the LDAR programme referred to in Article 14 (1), operators must provide the following:

1. Ħarsa ġenerali

,
Titlu Regolamentazzjoni

1.1 Referenzi

1.2 Rekwiżiti identifikati

1.3 Standards relatati

2. Rekwiżiti identifikati

Rekwiżiti
Sors Rekwiżit

3. Standards relatati

Standards
Sors Rekwiżit