|
+Article 64 4. |
Article 64 4.In relation to the attainment of the 2030 interconnection target, as stipulated under Regulation (EU) 2018/1999, the electricity link between Malta and Italy shall be duly taken into account.
1. Yleiskatsaus
1.1 Viittaukset1.2 Tunnistetut vaatimukset1.3 Liittyvät standardit2. Tunnistetut vaatimukset
3. Liittyvät standardit
|