+Article 64 4.

Article 64 4.

In relation to the attainment of the 2030 interconnection target, as stipulated under Regulation (EU) 2018/1999, the electricity link between Malta and Italy shall be duly taken into account.

1. Pregled

,
Naslov Regulativa

1.1 Reference

1.2 Utvrđeni zahtjevi

1.3 Povezani standardi

2. Utvrđeni zahtjevi

Zahtjevi
Izvor Zahtjev

3. Povezani standardi

Standardi
Izvor Zahtjev