|
+Article 64 4. |
Article 64 4.In relation to the attainment of the 2030 interconnection target, as stipulated under Regulation (EU) 2018/1999, the electricity link between Malta and Italy shall be duly taken into account.
1. Panoramica
1.1 Riferimenti1.2 Requisiti identificati1.3 Standard correlati2. Requisiti identificati
3. Standard correlati
|