|
+Article 64 4. |
Article 64 4.In relation to the attainment of the 2030 interconnection target, as stipulated under Regulation (EU) 2018/1999, the electricity link between Malta and Italy shall be duly taken into account.
1. Prehľad
1.1 Odkazy1.2 Identifikované požiadavky1.3 Súvisiace štandardy2. Identifikované požiadavky
3. Súvisiace štandardy
|