|
+Article 64 4. |
Article 64 4.In relation to the attainment of the 2030 interconnection target, as stipulated under Regulation (EU) 2018/1999, the electricity link between Malta and Italy shall be duly taken into account.
1. Apžvalga
1.1 Nuorodos1.2 Nustatyti reikalavimai1.3 Susiję standartai2. Nustatyti reikalavimai
3. Susiję standartai
|