|
+Article 64 4. |
Article 64 4.In relation to the attainment of the 2030 interconnection target, as stipulated under Regulation (EU) 2018/1999, the electricity link between Malta and Italy shall be duly taken into account.
1. Ħarsa ġenerali
1.1 Referenzi1.2 Rekwiżiti identifikati1.3 Standards relatati2. Rekwiżiti identifikati
3. Standards relatati
|