+SECTION 1 Gas and electricity infrastructure projects
---+Article 4 Objectives
---+Article 5 Priorities
---+Article 6 Granting of Community financial assistance
------+Article 6 1.
------+Article 6 2.
------+Article 6 3.
---+Article 7 Eligibility
------+Article 7 1.
------+Article 7 2.
------+Article 7 3.
---+Article 8 Selection and award criteria
------+Article 8 1.
------+Article 8 2.
---+Article 9 Funding conditions
------+Article 9 1.
------+Article 9 2.
---+Article 10 Instruments
------+Article 10 1.
------+Article 10 2.
---+Article 11 Member States’ financial responsibilities
------+Article 11 1.
------+Article 11 2.

SECTION 1 Gas and electricity infrastructure projects

SECTION 1 Gas and electricity infrastructure projects

1. Overview

,
Summary Regulation
Article 4 Objectives

Article 4

Objectives

The Community shall promote gas and electricity infrastructure projects having the highest Community added value and contributing to the following objectives:

(a) 

security and diversification of sources of energy, routes and supplies;

(b) 

the optimisation of the capacity of the energy network and the integration of the internal energy market, in particular concerning cross-border sections;

(c) 

the development of the network to strengthen economic and social cohesion by reducing the isolation of the least favoured regions or islands of the Community;

(d) 

the connection and integration of renewable energy resources; and

(e) 

the safety, reliability and interoperability of interconnected energy networks, including the ability to use multidirectional gas flows where necessary.

Article 5 Priorities

Article 5

Priorities

The EEPR shall serve urgently to adapt and develop energy networks of particular importance to the Community in support of the operation of the internal energy market and, in particular, to increase interconnection capacity, security and diversification of supply and to overcome environmental, technical and financial obstacles. Special Community support is necessary to develop energy networks more intensively and to accelerate their construction, notably where the diversity of routes and sources of supply is low.

Article 6 Granting of Community financial assistance
Article 7 Eligibility
Article 8 Selection and award criteria
Article 9 Funding conditions
Article 10 Instruments
Article 11 Member States’ financial responsibilities

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement
  • Builddate: 24.12.2018 00:00:00 -Doknr: CELEX:32009R0663
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.