+Article 42 3.

Article 42 3.

The transmission system operator shall not be entitled to refuse a new connection point, on the ground that it would lead to additional costs resulting from the necessary capacity increase of system elements in the close-up range to the connection point.

1. Overview

,
Summary Regulation

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards