+Article 42 3. |
Article 42 3.The transmission system operator shall not be entitled to refuse a new connection point, on the ground that it would lead to additional costs resulting from the necessary capacity increase of system elements in the close-up range to the connection point.
1. Pregled
1.1 Reference1.2 Utvrđeni zahtjevi1.3 Povezani standardi2. Utvrđeni zahtjevi
3. Povezani standardi
|