+Article 42 3.

Article 42 3.

The transmission system operator shall not be entitled to refuse a new connection point, on the ground that it would lead to additional costs resulting from the necessary capacity increase of system elements in the close-up range to the connection point.

1. Ülevaade

,
Pealkiri Regulatsioon

1.1 Viited

1.2 Tuvastatud nõuded

1.3 Seotud standardid

2. Tuvastatud nõuded

Nõuded
Allikas Nõue

3. Seotud standardid

Standardid
Allikas Nõue