|
+Article 42 3. |
Article 42 3.The transmission system operator shall not be entitled to refuse a new connection point, on the ground that it would lead to additional costs resulting from the necessary capacity increase of system elements in the close-up range to the connection point.
1. Overzicht
1.1 Referenties1.2 Geïdentificeerde eisen1.3 Gerelateerde standaarden2. Geïdentificeerde eisen
3. Gerelateerde standaarden
|