|
+Article 42 3. |
Article 42 3.The transmission system operator shall not be entitled to refuse a new connection point, on the ground that it would lead to additional costs resulting from the necessary capacity increase of system elements in the close-up range to the connection point.
1. Apžvalga
1.1 Nuorodos1.2 Nustatyti reikalavimai1.3 Susiję standartai2. Nustatyti reikalavimai
3. Susiję standartai
|