+Article 42 3.

Article 42 3.

The transmission system operator shall not be entitled to refuse a new connection point, on the ground that it would lead to additional costs resulting from the necessary capacity increase of system elements in the close-up range to the connection point.

1. Pregled

,
Naslov Regulativa

1.1 Sklici

1.2 Ugotovljene zahteve

1.3 Povezani standardi

2. Ugotovljene zahteve

Zahteve
Vir Zahteva

3. Povezani standardi

Standardi
Vir Zahteva