+Article 42 3.

Article 42 3.

The transmission system operator shall not be entitled to refuse a new connection point, on the ground that it would lead to additional costs resulting from the necessary capacity increase of system elements in the close-up range to the connection point.

1. Visão geral

,
Título Regulamentação

1.1 Referências

1.2 Requisitos identificados

1.3 Normas relacionadas

2. Requisitos identificados

Requisitos
Fonte Requisito

3. Normas relacionadas

Normas
Fonte Requisito