+Article 42 3. |
Article 42 3.The transmission system operator shall not be entitled to refuse a new connection point, on the ground that it would lead to additional costs resulting from the necessary capacity increase of system elements in the close-up range to the connection point.
1. Visão geral
1.1 Referências1.2 Requisitos identificados1.3 Normas relacionadas2. Requisitos identificados
3. Normas relacionadas
|