+Annex 4 – non-comprehensive list of methods available to either institutions for their assurance work or authorities for testing
|
Annex 4 – non-comprehensive list of methods available to either institutions for their assurance work or authorities for testing
| a. Self-certification | Where the institution self-certifies its compliance with a rule. A self-assessment is the assessment by the institution of its own capabilities to perform the tasks requested in a timely manner and to meet the quality expected. Self-assessment assumes a review of the existing processes and procedures, | | b. Self-assessment | and potentially a review of the lessons learnt from past stress situations. A self-assessment results in a gap analysis between what the institution’s capabilities and the authority’s expectations are. |
- c. Firm sharing re-sults of its sys-
| tems or internal testing via demonstrations to authorities / walkthrough | A ‘walkthrough test’ traces an operation step -by-step through the MIS or procedures from its inception to the final disposition. Process-oriented, focused and flexible plausibility check of | | d. Fire drill | selected steps in a playbook. Dry runs are real-life simulation exercises where institutions test (selected) parts of the elements identified by the | | e. Dry run | resolution authority based on a test crisis event, and identify areas for improvement to ensure that the resolution strategy can be implemented in an effective and timely manner. | | f. Desktop exercise | Initial stage to enhance playbooks and ensure standardisation, consistency and alignment with the requirements for the documentation of key processes by individual steps, including timing, responsibilities and dependencies. Back-office testing where figures are reconciled between different documents in order to assess the accuracy and reliability of a data set. Review of the resolvability capabilities by internal audit, as part | | g. Internal audit | of their institution ’ s assurance work for continued resolvability. |
| third-party verifi-cation | Review of the resolvability capabilities by a third-party expert. In-depth review on a specific topic carried out at the | | i. Deep dive | institution’s premises over a pre-defined timeline. On-site inspections are investigations and testing performed by authorities with a pre-defined scope and timeframe and take | | j. On-site inspec-tion | place on the premises of the institutions. Inspections should be intrusive while adhering to the principle of proportionality and aim to provide a detailed snapshot of the adequacy and execution of processes. |
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- EBA - Published by the European Banking Authority at https://www.eba.europa.eu/
|